BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 10, 2022 at 7:00 PM

Updated November 16, 2023

Site work and paving for a mixed-use development in Sheboygan Falls, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

As of January 10, 2022, this project is in the conceptual phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to August 2022. *The closed solicitation has been included below for reference: Solicitation ID: NE-03 County : 59 - Sheboygan County Limit : STH 23 - STH 42 Anticipated Construction Cost: $3,000,000-$3,999,999 The pavement needs treatment to extend the service life and structures need replacement. Perpetuation project; resurfacing extends from STH 32 to STH 42 ( 6.39 miles) in the Towns of Johnsville and Franklin in Sheboygan County. In addition to resurfacing, beam guard, curb ramps, and culvert pipes will be replaced Advertised Fixed Fee %: : 7.25 The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interviews will not be conducted The method of contractor selection has not been determined at this time. WIDOT - RFP Engineering - Sheboygan Falls - Howards Grove *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Roads / Highways

$4,000,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
104
Bidding Soon
978
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2022

Project location map

WI-32, Sheboygan Falls, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.