BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Chester, Illinois. Design plans call for the renovation of a detention facility.

As of November 3, 2022, an engineer has been selected. The stage of design and a firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: The scope of work provides for replacing the 4160 volt primary electrical distribution system at this facility. The work includes all new primary medium voltage cabling underground and overhead, from the point of supply by the serving utility to the step down transformers supplying the facility. The work also includes new substations, medium voltage switching units and medium voltage transformers. APPROPRIATED AMOUNT: $21,249,200 PROFESSIONAL LIABILITY INSURANCE REQUIRED: $4,500,000 PROJECT FEE CLASSIFICATION: Group II R Questions related to any information in the PSB, including instructions and submittal procedures should be directed to the QBS Department at 217/524-6400. The procurement of design services by the Capital Development Board (CDB) is governed by the Illinois Compiled Statutes; Illinois Procurement Code, 30 ILCS 500 and Architectural, Engineering and Land Surveying Qualifications Based Selection Act, 30 ILCS 535. The A/E will need to determine if any components of this project are eligible for a utility company or other energy grant/rebate and will be responsible for preparing and submitting the grant application if the project qualifies for the rebate. A combined MBE/WBE goal of 20 percent is applicable to the A/E team. Some level of participation from both MBE and WBE firms is required to satisfy this goal (this requires including one or more MBE AND one or more WBE firms on the team). A VBE/PBE goal of 3 percent is applicable to the A/E team. The interviews for this project are tentatively scheduled for December 8, 2021. Selections from this project will be presented at the January 11, 2022, Board Meeting. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Design

Jails / Prisons

$21,249,200.00

Public - State/Provincial

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
40
Bidding Soon
791
All Active Projects
299
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2023

img_map_placeholder

711 E Kaskaskia St, Chester, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.