Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a water / sewer project in Sunnyvale, California. Conceptual plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
This project entails constructing a new anaerobic digester, Digester No. 5. Digesters are part of the solids treatment process in the Water Pollution Control Plant (WPCP). The sludge produced by the secondary treatment process in the WPCP is anaerobically treated by digesters to make the sludge safe for disposal in landfills after it is thickened and dewatered. The major project elements include the following: (1) one anaerobic digester equivalent in size to Digester No. 4 (about one mega gallon); (2) approximately 50 linear feet of utilidor to connect the digester to the utilidor system; (3) digester mixing system with a digester mixing pump; (4) digester heating system with a heat exchanger, digester sludge circulating pump, digester hot water circulating pump, and a raw sludge hot water pump; (5) digester sludge pumping system with a digester supernatant pump; and (6) influent sludge grinder. Digester No. 5 is Project 4.4 in the Sunnyvale Cleanwater Program SCWP) Master Plan adopted by City Council in 2016. The Engineering Design phase of the project starts in FY 2024/25 and ends in FY 2025/26, while the Construction phase of the project starts in FY 2025/26 and ends in FY 2027/28. As September 22, 2022, this project is currently in the FY 2022 - 2023 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024 - 25. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024 - 25. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$9,750,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2025
To Be Determined, Sunnyvale, CA
Related To This Project
Sunnyvale, CA
--
Sunnyvale, CA
--
Sunnyvale, CA
--
Sunnyvale, CA
Bid Date: Oct 11 2023
Sunnyvale, CA
Bid Date: Mar 27 2024
Sunnyvale, CA
--
Sunnyvale, CA
--
Sunnyvale, CA
--
Sunnyvale, CA
--
Sunnyvale, CA
Bid Date: Sep 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.