BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and new construction of a water / sewer project in Sunnyvale, California. Conceptual plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

This project entails constructing a new anaerobic digester, Digester No. 5. Digesters are part of the solids treatment process in the Water Pollution Control Plant (WPCP). The sludge produced by the secondary treatment process in the WPCP is anaerobically treated by digesters to make the sludge safe for disposal in landfills after it is thickened and dewatered. The major project elements include the following: (1) one anaerobic digester equivalent in size to Digester No. 4 (about one mega gallon); (2) approximately 50 linear feet of utilidor to connect the digester to the utilidor system; (3) digester mixing system with a digester mixing pump; (4) digester heating system with a heat exchanger, digester sludge circulating pump, digester hot water circulating pump, and a raw sludge hot water pump; (5) digester sludge pumping system with a digester supernatant pump; and (6) influent sludge grinder. Digester No. 5 is Project 4.4 in the Sunnyvale Cleanwater Program SCWP) Master Plan adopted by City Council in 2016. The Engineering Design phase of the project starts in FY 2024/25 and ends in FY 2025/26, while the Construction phase of the project starts in FY 2025/26 and ends in FY 2027/28. As September 22, 2022, this project is currently in the FY 2022 - 2023 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024 - 25. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024 - 25. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$9,750,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
69
Bidding Soon
1,442
All Active Projects
620
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2025

img_map_placeholder

To Be Determined, Sunnyvale, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.