Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a water / sewer project in Millbrae, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
**As of January 17, 2022 the project has not been awarded yet.** Bids will be opened and read in public via a Zoom meeting. Please access the meeting at this website: https://sfwater.zoom.us. To join, enter Meeting ID and Passcode when prompted. The Meeting ID and Passcode are identified in Section 00 01 02. Subsequently, the City will furnish Bid tabulations to a Bidder who requests said information. The objective of the project will perform miscellaneous upgrades on existing groundwater sites located in the SF Peninsula area. The upgrades vary by site and they include mechanical, electrical, structural, and corrosion protection upgrades. The work is to be performed in San Mateo County, California. Attendance of remote attendees will be completed at the end of the pre-bid meeting. Please be advised that prior to receiving these materials, all requestors will be required to complete, sign, and comply with a Confidentiality Agreement. Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B. The LBE Subcontracting Participation Requirement is 13.00%. Both San Francisco Small & Micro-LBEs and SFPUC-LBEs (Firms certified by SF Contract Monitoring Division) can be utilized to meet this requirement. The 13% minimum requirement was established in consideration of the project consisting of various specialized scopes requiring specialized licenses. This includes Cathodic Protection work, flowmeters, VFDs (variable frequency drives), and surge anticipation valves - all of which are associated with groundwater wells. Please contact Linda Rainaldi at (415) 754-3227 for further information. Subcontracting opportunities may include, but not limited, to the following major types of work: Electrical, mechanical, and cathodic protection. Prime Bidder's attendance at this conference is worth 15 points toward Chapter 14B "Good Faith Outreach" requirements. Documented attendance in the teleconference pre-bid meeting will satisfy this requirement. Bidders must achieve at least 80 points (out of a possible 100 points), as determined by CMD, to be deemed compliant with the "Good Faith Outreach" requirements, except those who exceed the above stated LBE subcontracting participation requirement by 35% under Section 14B.8(B) of the Administrative Code. SFPUC encourages Bidders to submit a Safety Prequalification Form at least 3-weeks prior to the date of Bid opening. Bidders are required to pass the Safety Prequalification prior to SFPUC considering their bid submission complete. SFPUC will notify Bidders who have passed the Safety Prequalification prior to or on the date of Bid opening. A Class "A" California Contractors License is required to bid. Furthermore, each listed subcontractor must possess appropriate active licenses for the work each subcontractor will be performing The LBE Subcontractor Participation Requirement for this Contract is 10.00% 4.2% MBE; 1.5% WBE; 4.3% OBE Anticipated NTP: Feb-March 2022 Substantial Completion Duration: 365 Days Final Completion Duration: 60 Days In subparagraph 1.02A, DELETE 365 and REPLACE WITH 548
Bid Results
Water / Sewer
$6,850,000.00
Public - County
Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 18, 2021
February 1, 2022
1000 El Camino Real, Millbrae, CA
Related To This Project
Millbrae, CA
Bid Date: Sep 13 2022
Millbrae, CA
Bid Date: Nov 29 2023
Millbrae, CA
Bid Date: Nov 15 2023
Millbrae, CA
Bid Date: Nov 29 2023
Millbrae, CA
--
Millbrae, CA
Bid Date: Dec 14 2023
Millbrae, CA
Bid Date: Oct 30 2024
Millbrae, CA
Bid Date: Nov 24 2021
Millbrae, CA
Bid Date: Mar 21 2022
Millbrae, CA
--
Millbrae, CA
Bid Date: Feb 15 2022
Millbrae, CA
Bid Date: Nov 15 2021
Millbrae, CA
Bid Date: Sep 19 2023
Millbrae, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.