BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 7, 2022 at 8:00 PM

Updated January 26, 2024

Demolition, site work, new construction and renovation of an educational facility in Boston, Massachusetts. Completed plans call for the demolition of a educational facility; for the construction of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

As of April 07, 2022, project has been under construction since early March 2022. All subs have been awarded. RFQ - Construction Management Services for Bunker Hill Community College Building E Renovation-Sub Bid Project : Request for Qualifications for 14 Trade Contractor Packages: Masonry; Miscellaneous & Ornamental Iron; Waterproofing, Dampproofing & Caulking; Roofing & Flashing; Glass & Glazing; Tile; Acoustical Tile; Resilient Floors; Painting; Elevators; Fire Protection; Plumbing; HVAC; Electrical, for Bunker Hill Community College - New Student Success Center - Building E Renovations, Boston, MA. This project involves construction of a new building, partial renovation of E Building, which was constructed in 1973, the demolition of the M Building (modular building), and the replacement of the primary electrical infrastructure on the Charlestown Campus. Sub Bid Category : Masonry ($300,000); Miscellaneous & Ornamental Iron ($225,000); Waterproofing, Dampproofing & Caulking ($175,000); Roofing & Flashing ($1,770,000); Glass & Glazing ($195,000); Tile ($115,000); Additional Information : Acoustical Tile ($750,000); Resilient Floors ($390,000); Painting ($350,000); Elevators ($150,000); Fire Protection ($725,000); Plumbing ($890,000); HVAC ($5,525,000); Electrical ($3,725,000). This is a Construction Management at Risk project under M.G.L. c. 149A. Interested firms MUST submit a Qualification Statement by the deadline and be prequalified in order to later bid on this project. DCAMM Certification applies for this process. This Request for Qualifications is the first part of a two-step process for Trade Contractors. Interested firms must submit the Qualification Statement. Then, at a later date, only prequalified firms will be invited to submit bids for the category of works in which they were prequalified. This required Qualification Statement is different from DCAMM Certification. All firms must be qualified for this project, even if already DCAMM Certified. Construction Manager is Bond Building Construction, Inc. Contractor Qualification DCAMM Certificate This project involves the construction of a new building, partial renovation of E Building, the demolition of the M Building and replacement of the primary electrical infrastructure on the Bunker Hill Community College Charlestown Campus in Boston, MA.

Under Construction

Educational

$54,000,000.00

Public - State/Provincial

Demolition, New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
7
Bidding Soon
2,413
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2021

March 7, 2022

Project location map

250 Rutherford Ave, Boston, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.