Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 30, 2021 at 7:00 PM
Updated November 16, 2023
Renovation of an educational facility in Aberdeen, Washington. Completed plans call for the renovation of a educational facility.
As of 12/30/2021 This project has not been awarded. Before coming to campus visitors will conduct a self-health assessment and not come to campus if you have any COVID-19 symptoms as defined by the CDC. o For the duration of time you are in any college facilities you will be required to wear a mask in accordance with the Department of Health mask order. o While visiting college premises you will limit in-person interactions. o You will maintain good hygiene, i.e.; washing hands. o Be mindful of interactions with others, and group sizes including entrances, exits, elevators, conference rooms, etc. ensuring you are maintaining physical distancing with no close contact at all times. If you have questions, please contact us at david.hruska@des.wa.gov or call (360) 688-4382 or EASMail@des.wa.gov or call (360) 902-7272. Please direct questions regarding this project to the office of the Consultant, KMB architects, 906 Columbia St SW, Suite 400, Olympia, WA 98501, telephone (360) 352-8883, Attn: Brian Little, brianlittle@kmb-architects.com. Within 72 hours following the bid opening, results will be available on the FPS web site at https://apps.des.wa.gov/EASbids/BidResult.aspx. The State of Washington prevailing wage rates are applicable for this public works project located in Grays Harbor County. Bidders are responsible to verify and use the most recent prevailing wage rates. The "Effective Date" for this project is the Bid Form due date above. The applicable prevailing wage rates may be found on the Department of Labor & Industries . Mandatory 15% apprentice labor hours of the total labor hours are a requirement of the construction contract. Voluntary workforce diversity goals for this apprentice participation are identified in the Instructions to Bidders and the General Conditions for Washington State Facility Construction. Bidders may contact the Department of Labor & Industries, Apprenticeship Section, to obtain information on available apprenticeship programs. In accordance with RCW 39.30.060, if the base bid and the sum of the additive alternates is one million dollars or more, the Bidder is required to provide the names of the Subcontractors with whom the Bidder will directly subcontract for the performance of heating, ventilation and air conditioning (HVAC), plumbing and electrical for this project on Subcontractor List Form A within one hour of the bid submittal time via email to FPSsubcontractorlist@des.wa.gov. The Bidder shall also provide names of the Subcontractors with whom the Bidder will subcontract for structural steel installation and rebar installation on Subcontractor List Form B within 48 hours of the bid submittal time via email to FPSsubcontractorlist@des.wa.gov. Supplemental Bidder Responsibility will be evaluated for this project. In determining Bidder responsibility, the Owner shall consider an overall accounting of the criteria set forth in "DIVISION 00 SUPPLEMENTAL RESPONSIBILITY CRITERIA". Please direct questions regarding this subject to the office of the Consultant. The successful bidder is required to comply with the COVID-19 Safety and Vaccination Verification Declaration Requirements in the Supplemental Conditions for Washington State Facilities Construction and provide the Vaccination Verification Declaration prior to award of the contract. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% Washington Small Business, and 5% Veterans have been established for this project. Achievement of the goals is encouraged. Estimated Bid Cost Range: $38,500,000.00 To $43,000,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Educational
$40,027,148.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 14, 2021
February 14, 2022
1620 Edward P Smith Dr, Aberdeen, WA
Related To This Project
Aberdeen, WA
Bid Date: Feb 23 2021
Aberdeen, WA
Bid Date: Mar 21 2022
Aberdeen, WA
Bid Date: Feb 24 2022
Aberdeen, WA
Bid Date: Mar 14 2019
Aberdeen, WA
Bid Date: Jul 12 2021
Aberdeen, WA
Bid Date: May 07 2021
Aberdeen, WA
Bid Date: Jan 25 2022
Aberdeen, WA
Bid Date: Aug 11 2021
Aberdeen, WA
--
Aberdeen, WA
--
Aberdeen, WA
Bid Date: Dec 14 2021
Aberdeen, WA
Bid Date: Jan 05 2022
Aberdeen, WA
Bid Date: Jul 20 2023
Aberdeen, WA
Bid Date: Jul 06 2023
Aberdeen, WA
Bid Date: Jun 05 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
