BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Asheville, North Carolina. Completed plans call for the renovation of a educational facility.

Solicitation- 07451-0015 Single prime bidders must identify on their bid the subcontractors they have selected for the subdivisions or branches of work for: Electrical General Asheville-Buncombe Technical Community College has adopted guidelines for establishing a verifiable percentage goal for participation by minority businesses in projects awarded pursuant to NC General Statute 143-128.2 with respect to the erection, construction, alteration or repair of any buildings when the entire cost of such works shall exceed $30,000. Among other things, these guidelines provided that notification will be given to certain minority businesses of the projects. All Bidders are hereby notified that they must have proper license under the laws of the State of North Carolina, and that the requirements of Chapter 87 of the General Statutes of North Carolina will be observed. Bids shall include all taxes and, in particular, North Carolina and local sales and use taxes. A bid bond is required for this project. A performance bond and a labor and material payment bond will not be required for this project. Payment will be made on the basis of ninety-five percent (95%) of monthly estimates and final payment made upon completion and acceptance of work. The Owner reserves the right to reject any or all proposals and to waive informalities. A-B Tech is renovating a portion of the Birch Building occupied by the Buncombe County Schools Early College. The work of this project includes selective interior demolition to remove existing non-load bearing partitions and construction of new non-load bearing partitions to modify exiting and access to the portion of this building utilized by early college students and staff. New doors and hardware are included in this scope of work. Electronic door access controls components and wiring are excluded from this scope of work. Electrical work in this contract includes rough-in for future electronic door access controls and changes to the existing exit signage within the scope area.

Award

Educational

$50,023.00

Public - County

Renovation

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
48
Bidding Soon
664
All Active Projects
311
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2021

April 1, 2022

img_map_placeholder

17 Student Cir, Asheville, NC

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.