Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 8, 2021 at 7:00 PM
Updated October 9, 2024
Site work for a water / sewer project in Penn Hills, Pennsylvania. Completed plans call for site work for a water / sewer project.
Contract A - Excavation Contract This project involves but is not limited to: one (1) sanitary sewer excavation spot repair, four (4) manhole installations, nineteen (19) manhole rehabs, invert/bench replacements, 3 pipe burst repairs (approximately 500 L.F. of 15" pipe bursting), and all traffic control and restoration of disturbed areas, complete in place. Contract B - MH to MH Lining Contract This project involves approximately seventeen (17) sanitary sewer MH-MH CIPP lining repairs (approximately 2,730 L.F.) including, but not limited to: sanitary sewer CIPP repair, pre and NASSCO compliant post-repair CCTV inspections, internal reinstatement of active service laterals, cutting of protruding taps, line cleaning, all traffic control and resident notification, complete in place. Pennsylvania Prevailing Wage rates are required to be paid on this Project Bids must be accompanied by a Certified Check or Bidder's Bond from a Surety Company authorized to do business in Pennsylvania, made to the order of Municipality of Penn Hills, Allegheny County, Pennsylvania in an amount equal to ten (10) percent of the total amount of the Proposal. Bids shall be valid for sixty (60) days beyond the time of bid opening. The Municipality of Penn Hills, Pennsylvania reserves the right to waive any formalities or to reject any or all Proposals. Bidder agrees that the Work will be substantially complete within ninety (90) calendar days after the date when the Contract Times commence to run as provided in Article 4 of the General Conditions, and will be completed and ready for final payment in accordance with Article 15 of the General Conditions within one hundred and twenty (120) calendar days after the date when the Contract Times commence to run or liquidated damages in the amount of five hundred dollars ($ 500.00) per calendar day. Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price. A 1 year - 100% Maintenance Bond will be required Clarification Deadline: 11/30/2021 5:00 PM
Bid Results
Water / Sewer
$146,985.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 7, 2021
January 10, 2022
727 Parkway Ave, Penn Hills, PA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
