BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2021 at 7:00 PM

Updated October 9, 2024

Site work for a water / sewer project in Penn Hills, Pennsylvania. Completed plans call for site work for a water / sewer project.

Contract A - Excavation Contract This project involves but is not limited to: one (1) sanitary sewer excavation spot repair, four (4) manhole installations, nineteen (19) manhole rehabs, invert/bench replacements, 3 pipe burst repairs (approximately 500 L.F. of 15" pipe bursting), and all traffic control and restoration of disturbed areas, complete in place. Contract B - MH to MH Lining Contract This project involves approximately seventeen (17) sanitary sewer MH-MH CIPP lining repairs (approximately 2,730 L.F.) including, but not limited to: sanitary sewer CIPP repair, pre and NASSCO compliant post-repair CCTV inspections, internal reinstatement of active service laterals, cutting of protruding taps, line cleaning, all traffic control and resident notification, complete in place. Pennsylvania Prevailing Wage rates are required to be paid on this Project Bids must be accompanied by a Certified Check or Bidder's Bond from a Surety Company authorized to do business in Pennsylvania, made to the order of Municipality of Penn Hills, Allegheny County, Pennsylvania in an amount equal to ten (10) percent of the total amount of the Proposal. Bids shall be valid for sixty (60) days beyond the time of bid opening. The Municipality of Penn Hills, Pennsylvania reserves the right to waive any formalities or to reject any or all Proposals. Bidder agrees that the Work will be substantially complete within ninety (90) calendar days after the date when the Contract Times commence to run as provided in Article 4 of the General Conditions, and will be completed and ready for final payment in accordance with Article 15 of the General Conditions within one hundred and twenty (120) calendar days after the date when the Contract Times commence to run or liquidated damages in the amount of five hundred dollars ($ 500.00) per calendar day. Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price. A 1 year - 100% Maintenance Bond will be required Clarification Deadline: 11/30/2021 5:00 PM

Bid Results

Water / Sewer

$146,985.00

Public - City

Site Work

12

20

2

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
253
Active Projects
130
Bidding Soon
1,224
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2021

January 10, 2022

Project location map

727 Parkway Ave, Penn Hills, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.