BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Penn Hills, Pennsylvania. Completed plans call for site work for a water / sewer project.

Contract A - Excavation Contract This project involves but is not limited to: one (1) sanitary sewer excavation spot repair, four (4) manhole installations, nineteen (19) manhole rehabs, invert/bench replacements, 3 pipe burst repairs (approximately 500 L.F. of 15" pipe bursting), and all traffic control and restoration of disturbed areas, complete in place. Contract B - MH to MH Lining Contract This project involves approximately seventeen (17) sanitary sewer MH-MH CIPP lining repairs (approximately 2,730 L.F.) including, but not limited to: sanitary sewer CIPP repair, pre and NASSCO compliant post-repair CCTV inspections, internal reinstatement of active service laterals, cutting of protruding taps, line cleaning, all traffic control and resident notification, complete in place. Pennsylvania Prevailing Wage rates are required to be paid on this Project Bids must be accompanied by a Certified Check or Bidder's Bond from a Surety Company authorized to do business in Pennsylvania, made to the order of Municipality of Penn Hills, Allegheny County, Pennsylvania in an amount equal to ten (10) percent of the total amount of the Proposal. Bids shall be valid for sixty (60) days beyond the time of bid opening. The Municipality of Penn Hills, Pennsylvania reserves the right to waive any formalities or to reject any or all Proposals. Bidder agrees that the Work will be substantially complete within ninety (90) calendar days after the date when the Contract Times commence to run as provided in Article 4 of the General Conditions, and will be completed and ready for final payment in accordance with Article 15 of the General Conditions within one hundred and twenty (120) calendar days after the date when the Contract Times commence to run or liquidated damages in the amount of five hundred dollars ($ 500.00) per calendar day. Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price. A 1 year - 100% Maintenance Bond will be required Clarification Deadline: 11/30/2021 5:00 PM

Bid Results

Water / Sewer

$146,985.00

Public - City

Site Work

12

20

2

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
39
Bidding Soon
779
All Active Projects
297
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 7, 2021

January 10, 2022

img_map_placeholder

727 Parkway Ave, Penn Hills, PA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.