BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Aston, Pennsylvania. Completed plans call for the renovation of a educational facility.

Contact Brian Datte, 610-497-6300 ext. 8600 for detailed information. Bids will be publicly opened in the Administration Building at the time and date indicated above. By Order of the Board of School Directors Erik Zebley Board Secretary DLN Project Summary The purpose of the project is to replace the existing air-cooled chiller, chilled water pumps, chilled water pumps' variable speed drives and chilled water plant automatic temperature control system, to provide a reliable and energy efficient means of cooling for the school. Recommendations include: replacing the one (1) existing 140 ton air-cooled chiller in kind, replace the two (2) existing constant flow primary chilled water pumps and associated valving in kind, replace the two (2) existing variable flow secondary chilled water pumps and associated valving in kind, replace the two (2) existing variable speed drives serving the secondary chilled water pumps in kind, replace the existing chilled water plant Automatic Temperature Controls (ATC) with new controls to perform the existing sequence of operations and comply with the district's current standards. Under a deduct alternate (Alternate Bid 1), the two (2) existing primary chilled water pumps and two (2) existing secondary chilled water pumps shall remain. Only the bearings, couplings and strainers in each of the pumps shall be replaced, and each pump shall be laser aligned. Electrical work shall consist of disconnecting power from and providing power to the mechanical equipment from the existing panel boards and providing new breakers. Scope of Work General: The scope of work as identified in the recommendations herein-above and further identified hereinbelow shall be completed by March 5th, 2022 at the very latest. Start-up and testing services shall be scheduled to occur as soon as weather permits, but prior to the start of the district's cooling season. Scope of Work: The scope of work for the project shall be as indicated on the attached documents. Below is a summary of this work: A. Replace the one (1) existing 140 ton air-cooled chiller and associated piping, valving, and vibration isolation in kind. B. Replace the two (2) existing constant flow primary chilled water pumps and associated piping and valving in kind C. Replace the two (2) existing variable flow secondary chilled water pumps and associated piping and valving in kind. D. Replace the two (2) existing variable speed drives serving the secondary chilled water pumps in kind. E. Replace the existing chilled water plant Automatic Temperature Control (ATC) system with new controls that perform the existing sequence of operations, comply with the district's current standards, and are integrated with the existing building's controls system(s). F. Disconnect power from and provide power to the mechanical equipment from the existing panel boards and providing new breakers. G. Properly dispose of demolished equipment and materials. Owner has the first right of refusal.

Award

Educational

$339,000.00

Public - County

Renovation

6

4

2

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
340
Active Projects
161
Bidding Soon
2,636
All Active Projects
1,286
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2021

January 3, 2022

img_map_placeholder

900 Tryens Rd, Aston, PA


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.