BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2022 at 7:00 PM

Updated November 14, 2023

Site work, paving and outdoor lighting for a mixed-use development in Bloomfield, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for outdoor lighting for a road / highway; and water / sewer project.

The Base Bid work for the above contract includes the installation of a new traffic signal on Bloomfield Road at STH 120 (Edwards Boulevard) and intersection improvements on Bloomfield Road from approximately 415' west of STH 120 to 540' east of STH 120. Major work items and approximate quantities for which bids are requested include 964 CY of Excavation Common, 185 tons of Select Crushed Material, 1,200 tons of Base Aggregate Dense 1 1/4 Inch, 500 tons of Base Aggregate Dense 3/4 Inch, 99 SY Concrete Pavement 9-Inch, 210 SY of Concrete Pavement Repair, 244 tons of HMA Pavement, 59 tons of Asphaltic Surface, 377 LF of Concrete Curb and Gutter, 232 SF of Concrete Sidewalk 5-Inch, 44 SF of Detectable Warning Field, 128 LF of Storm Sewer Pipe Reinforced Concrete, erosion control, permanent signing, traffic control, pavement marking, street lighting, traffic signals, and landscape restoration. Pre-Bid Meeting Info: Not required

Bid Results

Roads / Highways

$527,729.00

Public - City

Outdoor Lighting, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
529
Active Projects
300
Bidding Soon
3,617
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2022

February 28, 2022

Project location map

WI-120 & N Bloomfield Rd, Bloomfield, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.