BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 27, 2022 at 7:00 PM

Updated November 14, 2023

Site work, paving and outdoor lighting for a mixed-use development in Beaver Dam, Wisconsin. Completed plans call for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; water / sewer project; and water / sewer project.

Direct all bidding inquiries to Daniel Schmitt, PLA, at (608) 216-2059 or dschmitt@msa-ps.com. No proposal will be accepted unless accompanied by a certified check or bid bond, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. No bid may be withdrawn within 60 days after the actual date of the opening thereof. Pursuant to Section 66.0903, Wisconsin Statutes, the minimum wages to be paid on the project shall be in accordance with the wage rate scale established by Local wage rates. OWNER reserves the right to waive any informalities or to reject any or all bids. Published by the authority of the City of Beaver Dam. Aggregate, Safety Improvements, Water Utilities, Construction, Concrete Walkway, Electrical Installation/Construction, Bridge (Replacement or Rehabilitation), Landscaping, Excavation, Stormwater Improvements, Erosion Control - Temporary, Landscaping (Retaining Walls), Materials, Equipment and Supplies, Miscellaneous, Pedestrian Improvements, Sewer and Water Construction, Grubbing & Clearing The work for which bids are asked includes the following: o Removals: excavation common, landscaping, existing stone masonry wall and footings, existing railing, asphalt, unsound/damaged concrete, and lagoon fountain. o Erosion Control: Erosion mat, silt fence, sediment logs, stormwater swales, and stormwater drain. o Stone Wall Improvements: Aggregate base, dry-stacked stone wall, drain tile, backfill, mortar set capstone. o Fountains/Waterfall: pumps, plumbing, precast concrete structures, landscape stonework, metal railing fabrication and installation, floating fountains, and aerators. o Electrical: Light poles, outlets, and underground conduit. o Utilities: Replace existing storm sewer and structures. Replace water service. o Cast-in-place concrete: Concrete sidewalk improvements. o Pedestrian Bridge Repair and Restoration: Tuckpointing, bridge deck replacement. o Site and Turf Restoration: Site and turf restoration including a variety of planting beds and vegetation areas. General site clean up and amenities installed.

Bid Results

Roads / Highways

$963,604.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
102
Bidding Soon
1,401
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2022

February 28, 2022

Project location map

316 E South St, Beaver Dam, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.