Published February 9, 2022 at 7:00 PM

Updated November 15, 2023

Site work and paving for a mixed-use development in Beaver Dam, Wisconsin. Completed plans call for site work for a road / highway; sidewalk / parking lot; water / sewer project; for paving for a road / highway; and sidewalk / parking lot.

As of 02/09/2022 This project has been awarded to Ptaschinski Construction Inc in the amount of $1,175,016.48. The work for which bids are asked includes the following: 730 LF of sanitary sewer replacement (10" thru 21") and laterals along with associated sanitary sewer work; 760 LF of water main replacement (6" thru 8") and services; 790 LF of storm sewer replacement (12" thru 15" and 23"x14") and associated storm structure work; 3,100 SY aggregate base and geogrid installation; 1,500 SY topsoil and sodding; 80 TON of asphalt pavement; 2,250 SY of concrete pavement; 7,700 SF of concrete sidewalk; 1,500 LF concrete curb and gutter; 3,700 SF concrete driveway; 1,200 SF segmental retaining wall; as well as all related work including unclassified excavation, erosion control, traffic control. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. No bid may be withdrawn within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with Federal Davis Bacon Wage Rates. Federal wage rates can be found at website. Be aware that project Administrators, Bidders, and Contractors are required to use the latest federal wage rate available at the time of bid opening. This project anticipates the use of Community Development Block Grant (CDBG) Funding. Attention of Bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. This project anticipates use of Wisconsin DNR Safe Drinking Water Loan Program OR Clean Water Fund Program funding. We encourage Disadvantaged Business Enterprises (DBEs), including Minorityowned Business Enterprises (MBEs), and Women's Business Enterprises (WBEs) to submit bid proposals. A municipality, in awarding prime contracts, and the primary engineer and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. The Contractor shall conform to the "Use of American Iron and Steel" provision of H.R. 3547 Consolidated Appropriations Act, 2014, section 436, including all iron and steel products used in the project. Bid Proposals may be denied if the requirements of this section are not met and waivers are required. EPA guidance for the use of American Iron and Steel (AIS) can be found at website. OWNER reserves the right to waive any informalities or to reject any or all bids.

Award

Roads / Highways

$1,175,016.00

Public - City

Paving, Site Work

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
96
Bidding Soon
1,426
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 20, 2022

March 1, 2022

Project location map

Haskell St, Beaver Dam, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.