BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 26, 2022 at 7:00 PM

Updated November 14, 2023

Site work, paving and renovation of a mixed-use development in Menomonie, Wisconsin. Completed plans call for the renovation of a educational facility; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime 29 contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general the work consists of approximately 580 lineal feet of new direct buried steam and condensate pipes, approximately 130 lineal of of box conduit with steam and condensate pipes, one new steam pit, removal of existing steam box conduit, pipes and pits, associated surface demolition and reconstruction, including electrical, lighting, asphalt roadway, sidewalk, retaining wall, sod and landscaping. Base Bid will be received for: A single lump sum bid for All Work. No deposit is required to obtain documents for bidding purposes. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after Septembe 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Award

Educational

$994,000.00

Public - State/Provincial

Paving, Renovation, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
140
Bidding Soon
1,278
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2022

May 16, 2022

Project location map

712 Broadway St S, Menomonie, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.