BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Big Stone Gap, Virginia. Completed plans call for the renovation of a playground / park / athletic field.

PURPOSE: The purpose and intent of this Quick Quote is to obtain a fixed price bid to furnish all labor, materials, tools, equipment, insurance, and supervision to conduct replacement of the Carriage House first and second for units and the Miller house unit located at Southwest Virginia Museum Historical State Park, 10 West First Street North, Big Stone Gap, Virginia 24219 SPECIFICATIONS: Contractor shall provide a fixed price bid to include the following minimum specifications to replace the existing Systems Carrier 38YRA024300 Model 3494E03825 (Carriage House First Floor), Carrier 38YRA024300 Model 0294E01560 (Carriage House Second Floor) and Lennox H25-411-2P model 5896A14862(Miller House Basement/1st Floor) with like and kind per specifications below: A. SCOPE OF WORK: 1. Contractor shall provide, install and render operational (3) Three new/unused Trane or Carrier units OR Agency Approved Equal matching the specified Seer Air handler and condenser units to replace existing system. 2. Contractor shall provide and install new/unused applicable refrigerant line, fiberglass or equivalent pad, programmable thermostat and snow legs on unit. 3. Contractor shall provide and install new/unused supply and return transitions, condensate drain pan and condensate piping outside building foundations. 4. Contractor shall remove existing units from the premises and dispose in accordance with all local and national standards. All refrigerants shall be handled in an environmentally responsible manner in accordance with the Clean Air Act. 5. Contractor shall install New/Unused minimum 15 Seer unit with matching air handler including auxiliary 10 kW heat strips. (Note: Of the two considerations in this specification, 16 SEER or 2 stage is the preferred specification. If offering units in half-ton increments the preferred specification is at least 15 SEER) 6. Contractor shall enlarge openings where necessary to install New/Unused unit. 7. Contractor is responsible for any carpentry needed to enlarge access openings including trim and finishing matching existing woodwork. 8. Contractor shall flush existing copper lines once new units are installed. Contractor shall practice lock out tag out safety procedures and follow all OSHA, State and Federal guidelines during installation as building will be occupied during repairs Work Hours: All Services shall be performed during normal business hours starting at 8:00 A.M. and coordinated with the park, Monday through Friday, except for State and Federal Holidays, unless mutually agreed upon by the Contractor and the Park Contact.. Warranty must be in line with greatest manufacturer commercial warranty available. All Warranty paperwork must be executed by the contractor and supporting paperwork provided at time of installation or with corresponding invoicing. Contractor shall provide unit and workmanship warranty information in the comments section of the quick quote or by email to Mary.Cook-Jones@dcr.virginia.gov at time of bid. Contractor shall perform a full system startup and review of the installation with park staff, including an overview of the operation and maintenance of the new system and installed accessories Contractor shall provide user printed maintenance manuals to park upon installation Contractor shall provide the business name, contact name, phone number and address of an authorized service repair vendor that will honor all warranty work and repairs on the product they (the bidder) offer in a same day or minimum 24 hour response time (including weekends). Contractor shall be required to provide subcontractors names in the event the company listed for requirement 9 is more than an hour from the installation location and information provided at the time of the bid. Failure to submit requirements 9 & 10 at time of bid may result in exclusion of bid from evaluations. Please include with your bid the following: a. Attachment A-Vendor Data Sheet b. Copy of General Contractors License in accordance with value of work performed. c. Material data sheets, cut sheets, pictures and product specifications being bid for materials to be used in project. d. Warranty information. Section B #5 & #6 e. Certified Repair Information. Section B #9 & #10

Award

Playgrounds / Parks / Athletic Fields

$22,600.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
31
Bidding Soon
368
All Active Projects
166
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2022

February 7, 2022

img_map_placeholder

10 W 1st St N, Big Stone Gap, VA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.