Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 21, 2022 at 7:00 PM
Updated November 15, 2023
Renovation of a municipal facility in Vancouver, Washington. Completed plans call for the renovation of a municipal facility.
** This project has been awarded to Centimark Corporation - Seattle in the amount of $49,723.** Furnish and install a snow retention system on the existing standing seam metal panel roof of the District Operations Center and Maintenance Building at the locations indicated on the attached figure. System shall be complete, in place, including all labor materials and equipment consisting ofS-5! ColorGard, clamps and clips manufactured by Garland, per attached cut sheets, or approved equal. The system shall be color matched to the existing roof and be installed without penetrating the roofing system. Contractor shall verify loading and field verify location, length and installation required and prepare a sketch along with proposed color for review and approval by District prior to fabrication and delivery. Compensation for this work will be paid per foot of installed snow dam. When the Contract does not include traffic control, erosion and sediment control, curb and concrete sidewalk, and trench safety systems as a pay item, then they shall be incidental to construction. All costs shall be included in other Contract pay items. Technical questions regarding this project may be addressed to Mike Mayhak, Project Manager at (360) 993-8844, or mmayhak@crwwd.com . Time of completion for initial work is 60 working days from the District's notice to proceed. All work shall be in accordance to the District's current Design Manual (including the Construction Specifications and Standard Drawings) and the description above. The District's Public Works Agreement is available upon request. A contract bond is required for projects over $50,000. The Contractor, and any subcontractors that may perform work on this project,are required to have their Labor & Industries Industrial Insurance Premiums current. The State of Washington prevailing wage rates for Clark County are applicable for this public works project. The effective date for prevailing wages or this project is thequote due date.
Award
Municipal
$49,723.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 6, 2022
February 7, 2022
4711 E 4th Plain Blvd, Vancouver, WA
Related To This Project
Vancouver, WA
Bid Date: Nov 23 2021
Vancouver, WA
Bid Date: Dec 19 2023
Vancouver, WA
--
Vancouver, WA
Bid Date: Feb 18 2025
Vancouver, WA
Bid Date: Feb 22 2022
Vancouver, WA
Bid Date: Feb 17 2022
Vancouver, WA
--
Vancouver, WA
--
Vancouver, WA
Bid Date: Dec 17 2021
Vancouver, WA
Bid Date: Jan 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
