EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 11, 2022 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Harmar Township, Pennsylvania. Completed plans call for site work for a water / sewer project.

Proposal must be upon the forms furnished by Senate Engineering Company and must be accompanied by a certified check or bid bond, in the form attached to the Contract Documents, in the amount of 10% of the Bid, made payable to Harmar Township. Harmar Township reserves the right to waive any informalities or to reject any or all proposals, for any reason whatsoever. 212725(1-14,18-22) Provide all labor, equipment and materials for trenchless preliner (if required) CIPP lining of existing 8" diameter sanitary sewer pipe using the felt liner and hot water or steam cure technologies. Work includes but is not limited to, bypass pumping, pre-construction cleaning (including all debris and all root removal) and liner end seals, preliner / lining, reinstatement of lateral services, pre/post-construction closed circuit televising, temperature monitoring and recording, etc. with all appurtenant items of construction, and traffic control, complete The sanitary lines are located along Pine Alley, Poplar Way, Elm Alley, Birch Alley, Grant Street and Jefferson Alley in Harmar Township Completion- .45... .consecutive calendar days.

Bid Results

Water / Sewer

$68,542.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Switchboards
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Trees
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
98
Bidding Soon
921
All Active Projects
422
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2022

March 11, 2022

img_map_placeholder

Multiple Locations, Harmar Township, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

ACME Sanitary Sewer Lining Phase 3 Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.