BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in San Jose, California. Completed plans call for site work for a playground / park / athletic field.

As of 3/11/2022, the bid results and award for this solicitation are pending. The Project generally involves removal and replacement of seven (7) existing park playground equipment within existing footprint. Scope includes site preparation; demolition; grading and drainage; removal and replacement of the existing playground surfacing; site furnishings and other miscellaneous site amenities. Each bid must be accompanied by cash, a certified check, a cashier's check or a bidder's bond in the sum of not less than 10% of the total aggregate amount of the bid Checks shall be made payable to the order of the City of San Jose. Bonds shall be executed by a surety possessing a valid certificate of authority issued by the California Department of Insurance and shall name the City of San Jose as beneficiary. All bids must be addressed to the Director of Public Works, City of San Jose, shall bear the Project Number and Name and be in a sealed envelope. The Contractor's Payment Bond shall be for 100% of the contract amount. Question Deadline 03/03/2022 03:00:00 PM The Contractor shall diligently prosecute the contract to completion before the expiration of 160 WORKING DAYS Scope of Work for this project at all 7 park sites may include, but is not limited to: demolition, removal of existing play equipment, removal of fencing, clearing and grubbing, earthwork, grading and drainage, rigid and flexible paving, installation of new play equipment, installation of rubber resilient surfacing, fence painting, site furnishings, and miscellaneous site amenities. Project Location: 7 Park locations within the City of San Jose: 1. Backesto Park- N. 13th Street and Empire 2. Bellevue Park- Bellevue and Pomona Avenue 3. Boggini Park- Remington Way and Millbrook Drive 4. Danna Rock Park- Houndshaven and Thornhaven Way 5. Meadowfair Park- Barberry Lane and Corda Drive 6. Murdock Park- Castle Glen Avenue and Wunderlich Drive 7. Nancy Lane Park- Nancy Lane and Wilbur Avenue

Award

Playgrounds / Parks / Athletic Fields

$3,551,952.00

Public - City

Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
43
Bidding Soon
1,430
All Active Projects
621
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.