BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Bowler, Wisconsin. Completed plans call for the renovation of a municipal facility.

The Stockbridge-Munsee Property &Equipment Department is accepting bids for the installation of vinyl plank flooring and vinyl cove bases. Bids are to include the cost of labor And materials. Certification of Workers Comprehensive/Liability Insurance required. The Stockbridge-Munsee Property & Equipment Department for instillation of new vinyl floor and vinyl base board. The properties included for flooring project include Public Safety, Administration Building, Tribal Offices, Legal Building, Property & Equipment, Roads Department, Mohican LP, Library Museum, Elderly Center, and Family Center. Contract is for all labor and materials. Certification of Workers Comprehensive/Liability Insurance required. Address of Buildings Public Safety: W13455 camp 14 Rd Bowler WI, 54416 Administration: N8705 Moh He Con Nuck Rd Bowler WI, 54416 Tribal Office: N8476 Moh He Con Nuck Rd Bowler WI, 54416 Legal: N8476 Moh He Con Nuck Rd Bowler WI, 54416 P&E/Roads/LP: W13817 Cty Hwy A Bowler WI, 54416 Library Museum: N8510 Moh He Con Nuck Rd Bowler WI, 54416 Elderly: N8651 Maplewood St Bowler WI, 54416 Family Center: N8605 Oak St Bowler WI, 54416 - The approximated square footage of the project is 18,497 square feet. - The approximated footage for vinyl cove base is 2,831 1/2 feet. - Removal and disposal of existing floor coverings, mop board, and other remnants that are utilized to hold existing floor covering in place will be removed by Property & Equipment area on a scheduled basis with contractor. - The emptying of office. Hallway, and storage rooms will be performed by Property & Equipment Department on a scheduled basis with contractor. - Material and installation cost for new vinyl flooring, vinyl base board, adhesive, and labor. - Floor prep: Patch unlevel areas with concrete based patching compound. Material Schedule 1. 20 mil. Commercial rated LVP glue down type. 2. Floor Adhesive as recommended by manufacturer. 3. All areas to receive 4" vinyl cove base. 4. Install underlayment were necessary.

Post-Bid

Municipal

$100,000.00

Public - Federal

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
27
Bidding Soon
297
All Active Projects
129
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2022

March 7, 2022

img_map_placeholder

Multiple Locations, Bowler, WI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.