BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Telluride, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work is exclusively milling and paving and includes four locations within the Town of Telluride. With two locations optional, pending time and budget. All locations will require traffic control. A proposed construction schedule and traffic control plan will be provided to Public Works at a Pre-Construction Meeting. Work Item #1: West Colorado Avenue [Aspen Intersection to Fir]. This portion of the WORK involves for the full width of West Colorado Avenue, cutting existing asphalt at each end, milling 3 inches of asphalt, and then placing 3 inches of new asphalt (SX75 58-28). All millings will be hauled to the bottom of Keystone Hill to the San Miguel County Shop for reuse by San Miguel County. Work Item #2: West Columbia Avenue [Townsend to Oak]. This portion of the WORK involves for the full width of West Columbia Avenue, cutting existing asphalt at each end, milling 3 inches of asphalt, and then placing 3 inches of new asphalt (SX75 58-28). All millings will be hauled to the bottom of Keystone Hill to the San Miguel County Shop for reuse by San Miguel County. Work Item #3: 100 North Alder Street at East Colorado Avenue from valley pan to 30 feet north. This portion of the WORK involves for the full width of 100 North Alder Street, cutting existing asphalt at the north end, milling 3 inches of asphalt, and then placing 3 inches of new asphalt (SX75 58-28). All millings will be hauled to the bottom of Keystone Hill to the San Miguel County Shop for reuse by San Miguel County. Work Item #4: Mahoney Roundabout Eastbound at West Colorado Avenue for 20 feet. This portion of the WORK involves for the full width of the eastbound lane of West Colorado Avenue exiting the Mahoney roundabout heading east, cutting existing asphalt at the east end, milling 3 inches of asphalt, and then placing 3 inches of new asphalt (SX75 58-28). All millings will be hauled to the bottom of Keystone Hill to the San Miguel County Shop for reuse by San Miguel County. Work Item #5: OPTIONAL West Colorado Avenue [Fir Intersection to Pine Intersection]. This portion of the WORK involves for the full width of West Colorado Avenue, cutting existing asphalt at each end, milling 3 inches of asphalt, and then placing 3 inches of new asphalt (SX75 58-28). All millings will be hauled to the bottom of Keystone Hill to the San Miguel County Shop for reuse by San Miguel County. Work Item #6: OPTIONAL West Galena Avenue [Fir Intersection to East Side of Alley]. This portion of the WORK involves for the full width of West Galena Avenue, removing chip and seal and hauling if off site, placing road base as needed to assure crown, and placing 3 inches of new asphalt (SX75 58- 28). Work Item #5 and Work Item #6 will be completed if budget and timing allow. All pipeline, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels or other such facilities or attachments, and any encasements containing such facilities that have been installed underground to furnish any of the following services or materials: electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, sewage and drainage removal, traffic or other control systems or water. Questions are submitted online No Award Contract: Thursday, March 17, 2022 Contract Signed: Thursday, March 31, 2022 Notice to Proceed: Monday, April 4, 2022 Substantial Completion: Friday, October 7, 2022 End of Contract: Monday, October 31, 2022 General Requirements - Insurance Required

Post-Bid

Roads / Highways

$50,000.00

Public - City

Paving, Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
4
Bidding Soon
73
All Active Projects
23
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2022

April 4, 2022

img_map_placeholder

Multiple Locations, Telluride, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.