Site work and paving for a mixed-use development in Telluride, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work is exclusively milling and paving and includes four locations within the Town of Telluride. With two locations optional, pending time and budget. All locations will require traffic control. A proposed construction schedule and traffic control plan will be provided to Public Works at a Pre-Construction Meeting. Work Item #1: West Colorado Avenue [Aspen Intersection to Fir]. This portion of the WORK involves for the full width of West Colorado Avenue, cutting existing asphalt at each end, milling 3 inches of asphalt, and then placing 3 inches of new asphalt (SX75 58-28). All millings will be hauled to the bottom of Keystone Hill to the San Miguel County Shop for reuse by San Miguel County. Work Item #2: West Columbia Avenue [Townsend to Oak]. This portion of the WORK involves for the full width of West Columbia Avenue, cutting existing asphalt at each end, milling 3 inches of asphalt, and then placing 3 inches of new asphalt (SX75 58-28). All millings will be hauled to the bottom of Keystone Hill to the San Miguel County Shop for reuse by San Miguel County. Work Item #3: 100 North Alder Street at East Colorado Avenue from valley pan to 30 feet north. This portion of the WORK involves for the full width of 100 North Alder Street, cutting existing asphalt at the north end, milling 3 inches of asphalt, and then placing 3 inches of new asphalt (SX75 58-28). All millings will be hauled to the bottom of Keystone Hill to the San Miguel County Shop for reuse by San Miguel County. Work Item #4: Mahoney Roundabout Eastbound at West Colorado Avenue for 20 feet. This portion of the WORK involves for the full width of the eastbound lane of West Colorado Avenue exiting the Mahoney roundabout heading east, cutting existing asphalt at the east end, milling 3 inches of asphalt, and then placing 3 inches of new asphalt (SX75 58-28). All millings will be hauled to the bottom of Keystone Hill to the San Miguel County Shop for reuse by San Miguel County. Work Item #5: OPTIONAL West Colorado Avenue [Fir Intersection to Pine Intersection]. This portion of the WORK involves for the full width of West Colorado Avenue, cutting existing asphalt at each end, milling 3 inches of asphalt, and then placing 3 inches of new asphalt (SX75 58-28). All millings will be hauled to the bottom of Keystone Hill to the San Miguel County Shop for reuse by San Miguel County. Work Item #6: OPTIONAL West Galena Avenue [Fir Intersection to East Side of Alley]. This portion of the WORK involves for the full width of West Galena Avenue, removing chip and seal and hauling if off site, placing road base as needed to assure crown, and placing 3 inches of new asphalt (SX75 58- 28). Work Item #5 and Work Item #6 will be completed if budget and timing allow. All pipeline, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels or other such facilities or attachments, and any encasements containing such facilities that have been installed underground to furnish any of the following services or materials: electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, sewage and drainage removal, traffic or other control systems or water. Questions are submitted online No Award Contract: Thursday, March 17, 2022 Contract Signed: Thursday, March 31, 2022 Notice to Proceed: Monday, April 4, 2022 Substantial Completion: Friday, October 7, 2022 End of Contract: Monday, October 31, 2022 General Requirements - Insurance Required

Post-Bid

Roads / Highways

$50,000.00

Public - City

Paving, Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Art, Furniture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Cast-In-Place Concrete Curbs, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Fuel Distribution Utilities, Natural-Gas Distribution, Natural-Gas Piping, Hydronic and Steam Energy Utilities, Steam Energy Distribution, Underground Steam and Condensate Distribution Piping
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, General Vehicles, Bicycles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
5
Bidding Soon
71
All Active Projects
34
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2022

April 4, 2022

img_map_placeholder

Multiple Locations, Telluride, CO

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2022 Street, Alley, & Utility Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.