Site work and paving for a mixed-use development in Telluride, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The work is exclusively milling and paving and includes four locations within the Town of Telluride. With two locations optional, pending time and budget. All locations will require traffic control. A proposed construction schedule and traffic control plan will be provided to Public Works at a Pre-Construction Meeting. Work Item #1: West Colorado Avenue [Aspen Intersection to Fir]. This portion of the WORK involves for the full width of West Colorado Avenue, cutting existing asphalt at each end, milling 3 inches of asphalt, and then placing 3 inches of new asphalt (SX75 58-28). All millings will be hauled to the bottom of Keystone Hill to the San Miguel County Shop for reuse by San Miguel County. Work Item #2: West Columbia Avenue [Townsend to Oak]. This portion of the WORK involves for the full width of West Columbia Avenue, cutting existing asphalt at each end, milling 3 inches of asphalt, and then placing 3 inches of new asphalt (SX75 58-28). All millings will be hauled to the bottom of Keystone Hill to the San Miguel County Shop for reuse by San Miguel County. Work Item #3: 100 North Alder Street at East Colorado Avenue from valley pan to 30 feet north. This portion of the WORK involves for the full width of 100 North Alder Street, cutting existing asphalt at the north end, milling 3 inches of asphalt, and then placing 3 inches of new asphalt (SX75 58-28). All millings will be hauled to the bottom of Keystone Hill to the San Miguel County Shop for reuse by San Miguel County. Work Item #4: Mahoney Roundabout Eastbound at West Colorado Avenue for 20 feet. This portion of the WORK involves for the full width of the eastbound lane of West Colorado Avenue exiting the Mahoney roundabout heading east, cutting existing asphalt at the east end, milling 3 inches of asphalt, and then placing 3 inches of new asphalt (SX75 58-28). All millings will be hauled to the bottom of Keystone Hill to the San Miguel County Shop for reuse by San Miguel County. Work Item #5: OPTIONAL West Colorado Avenue [Fir Intersection to Pine Intersection]. This portion of the WORK involves for the full width of West Colorado Avenue, cutting existing asphalt at each end, milling 3 inches of asphalt, and then placing 3 inches of new asphalt (SX75 58-28). All millings will be hauled to the bottom of Keystone Hill to the San Miguel County Shop for reuse by San Miguel County. Work Item #6: OPTIONAL West Galena Avenue [Fir Intersection to East Side of Alley]. This portion of the WORK involves for the full width of West Galena Avenue, removing chip and seal and hauling if off site, placing road base as needed to assure crown, and placing 3 inches of new asphalt (SX75 58- 28). Work Item #5 and Work Item #6 will be completed if budget and timing allow. All pipeline, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels or other such facilities or attachments, and any encasements containing such facilities that have been installed underground to furnish any of the following services or materials: electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, sewage and drainage removal, traffic or other control systems or water. Questions are submitted online No Award Contract: Thursday, March 17, 2022 Contract Signed: Thursday, March 31, 2022 Notice to Proceed: Monday, April 4, 2022 Substantial Completion: Friday, October 7, 2022 End of Contract: Monday, October 31, 2022 General Requirements - Insurance Required
Post-Bid
Roads / Highways
$50,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2022
April 4, 2022
Multiple Locations, Telluride, CO
Related To This Project
Telluride, CO
Bid Date: Sep 30 2024
Telluride, CO
Bid Date: Mar 04 2022
Telluride, CO
Bid Date: Oct 15 2023
Telluride, CO
Bid Date: Sep 30 2022
Telluride, CO
--
Telluride, CO
--
Telluride, CO
Bid Date: Dec 08 2023
Telluride, CO
Bid Date: Mar 04 2022
Telluride, CO
--
Telluride, CO
Bid Date: Apr 26 2024
Telluride, CO
--
Telluride, CO
Bid Date: Jun 23 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.