BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 23, 2022 at 8:00 PM

Updated February 14, 2024

Site work and paving for a sidewalk / parking lot in Calmar, Iowa. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Project consists of two Divisions: Division One - Campus Main Drive - (IDOT NO. MAS-860-0(3)--7E-96 and Division Two-Campus West Drive (Local Project). Project consists of Asphalt Scarification(Milling) and Asphalt Resurfacing of both streets. Project includes Curb & Gutter Replacement and Sidewalk Reconstruction, as necessary. Approximate project quantities include 13,385 S.Y of Asphalt Milling, 2,172 Tons of HMA Paving, 723 S.Y. of Partial Depth Asphalt Patching, 1,948 L.F. of Curb & Gutter Replacement, 260 S.Y. of 4-IN & 6-IN P.C. Concrete Sidewalk along with related incidental and subsidiary work. Est. Value:$ 540,000.00 the Northeast Iowa Community College (NICC), Calmar Campus, Darwin Schrage Administration Board Room. Neither NICC nor its agents will assume liability for the inability of a bidder to submit a bid in a timely manner. Bidder bears full and complete responsibility for the timely submission of such bid. Bids received after the deadline will not be considered and will be returned to the bidder unopened. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Award

Sidewalks / Parking Lot

$611,799.00

Public - State/Provincial

Paving, Site Work

35

7

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
60
Bidding Soon
635
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2022

May 2, 2022

Project location map

1625 IA-150, Calmar, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.