BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2026 at 7:00 PM

Updated March 6, 2026

Demolition, site work and addition to a mixed-use development in Calmar, Iowa. Design plans call for the addition of a educational facility; library; and 900-seat educational facility.

The upcoming project will include the removal of the original 1930s building, which will be replaced with new construction including the Humanities Wing with classrooms built for language arts, foreign languages, and social studies. These classrooms will be situated above the new commons and cafeteria area, and alongside a modern library and learning center. In the existing portion of the school, classrooms will be remodeled to become a STEAM Wing which will be dedicated to science, technology, engineering (including agriculture and business), art and mathematics. A new main entrance will also be built on the north side, which will lead into the commons area and cafeteria. Adjacent to the entrance will be the new competition gym, which will include a walking track, new locker rooms, new weight room, and a state-of-the-art wrestling room with two full-size mats. The new facility will incorporate high-efficiency HVAC systems and modern building materials to ensure long-term energy savings. The school will retain and continue to use the newest sections of the existing high school facilities, including the auditorium, music room, current gym and locker rooms, elevator, wrestling room, classrooms located under the current gym, and district office. This project is part of the school district’s bond that passed. As of March 3, 2026, information regarding construction manager and general contractor selection has not been released. Further details regarding firm construction and completion timelines have not been disclosed. $13 million being paid for via the approved bond levy and the remaining amount to be funded rough sales tax (SAVE), voted Physical Plant and Equipment Levy (PPEL) funds, and over $2 million in cash reserves.

Design

Educational

$23,446,705.00

Public - County

Addition, Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2027

Project location map

Multiple Locations, Calmar, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.