BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, remodeling, renovation and addition to a mixed-use development in Firebaugh, California. Completed plans call for the addition of a educational facility; and for the renovation of a educational facility.

4 Projects including the following: Bailey Primary School Kitchen Renovation The project consists of renovating the entire kitchen area and equipment, adding walk-in refrigerator and freezer, replacing HVAC System, new flooring, wall-ceiling plus roofing finishes, new lighting and electrical provisions. Renovating Multi-Purpose Room and replacing windows, replacing HVAC System, replacing doors and upgrading. Provide ADA upgrades within building and parking area. Estimated Construction Cost: $ 2,766,000 Construction Timeframe: 6 months Mills Intermediate School Portable Classrooms Addition The project consists of adding three (3) Portable Classrooms over a concrete pad and related electrical, paving provisions, plus plumbing, fire line extension and fire lane extension surfacing. The Portables are provided and installed by others. Estimated Construction Cost: $ 300,000 Construction Timeframe: 3 months Firebaugh High School Auto Shop CTE Renovation The project consists of renovating the Auto Shop area, adding equipment, plus an exterior shade structure as an extension of the shop. The renovation includes replacing HVAC System, and wall-ceiling, plus roofing finishes, new lighting-electrical provisions. Providing ADA upgrades and exterior yard paving. Estimated Construction Cost: $ 2,300,000 Construction Timeframe: 5 months Firebaugh High School Classroom - Office Building Addition The project consists of building a 2,500 square foot classroom - office structure within the high school campus, including HVAC and utility provisions; and site work paving to integrate with campus. Estimated Construction Cost: $ 1,285,000 Construction Timeframe: 5 months

Post-Bid

Educational

$6,651,000.00

Public - City

Addition, Demolition, Remodeling, Renovation, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
34
Bidding Soon
616
All Active Projects
279
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2022

May 9, 2022

img_map_placeholder

Multiple Locations, Firebaugh, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.