BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Gasport, New York. Completed plans call for the renovation of a educational facility.

This project will proceed under one (1) Lump Sum prime contract for General Construction. The project consists of renovations for the Elementary School main office and Principal's office: replacing ceilings and lighting, and adding supplemental structural reinforcement and ductwork, in anticipation of a future HVAC upgrade. The date of commencement of the Work shall be within five (5) calendar days of the date of the Notice to Proceed. The period of onsite work is between April 9th and 22nd, 2022. The Contractor shall achieve Substantial Completion of the entire Work not later than April 22, 2022. Attention of the Bidder is particularly called to the Owner's sales tax exemption, the requirements as to conditions of employment to be observed and the minimum wage rates to be paid under the contract. In addition, the Bidding Documents for this project contain detailed requirements for the qualification of Bidders. These include, among other things, rigid bonding and insurance requirements, financial statements, bank references, lists of lawsuits, arbitrations or other proceedings in which the Bidder has been named as a party, a statement of surety's intent to issue Performance and Payment Bonds, and a description of other projects of similar size and scope completed by the Bidder. A non-collusive bidding certificate shall be included on each bid. Bids shall be prepared as set forth in aEURoeInstructions to Bidders, enclosed in a sealed envelope bearing on its face the name and address of the Bidder and the title of the Work to which the bid enclosed relates. Each Bidder shall deposit with its bid, security in an amount not less than five percent (5%) of the base bid in the form and subject to the conditions provided in the aEURoeInstructions to Bidders. No Bidder may withdraw his bid within forty-five (45) days after the actual bid opening. The Board of Education reserves the right to waive any and all informalities in or to reject any or all bids. The Owner further reserves its right to disqualify Bidders for any material failure to comply with the Instructions to Bidders and Supplementary Instructions to Bidders.

Post-Bid

Educational

$65,000.00

Public - County

Renovation

12

17

4

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
132
Bidding Soon
2,405
All Active Projects
1,007
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2022

April 9, 2022

img_map_placeholder

4500 Orchard Pl, Gasport, NY

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.