BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Ashland, Wisconsin. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Stuntz Ave Sewer projects consist of three locations for work within the City of Ashland, Ashland County, Wisconsin. The major project components are the removal and replacement of 870LF of sewer line and 3 sanitary sewer manholes. Associated construction includes removal of asphalt, concrete, and alley surfaces. Gravel alley reconstruction, erosion control, restoration, and traffic control are also significant components of the project. All costs for bypass pumping shall be considered incidental to adjacent work. The Stuntz Ave Sewer projects consist of three locations for work within the City of Ashland, Ashland County, Wisconsin. The first location is the alley between Stuntz Ave and 7th Ave E running from Main Street to USH2. This section will remove 8" VCP and replace with 8"PVC pipe. One existing manhole will be removed and replaced with precast concrete manhole. During construction sanitary service laterals will be dye tested and active lines reconnected to the main line. No change in line or grade or service area occurs for this section. The second project area is located East of Stuntz Ave and just south of Main Street. The existing 8" VCP in this area is failed to the extent that a camera can no longer pass through the pipe. Additionally the existing pipe is not laid in a straight line and has a bend north of the existing manhole that is to be replaced. The existing manhole in the alley will be replaced with a new precast concrete manhole. The 8" VCP outlet pipe will be replaced with 8" PVC. Clearing and grubbing will be required in this section. The third project area is located in the alley between Prentice Ave and 5th Ave E running from 9ths St E to 8th St E. This section will remove the existing 8" VCP with 8" PVC in the same line and grade. The new PVC line will be reconnected to the existing manhole structures. During construction sanitary service laterals will be dye tested and active lines reconnected to the main line. No change in line or grade or service area occurs for this section. Concrete aprons and sidewalks will be replaced as part of this project. Hot Mix Asphalt repaving and patching will be done by others. Pre-Bid Conference: A Pre-Bid Conference will not be held. Deadline for questions is Thursday, 04/28/2022 11:00 AM at 11:00 AM. All questions should be submitted in writing by email to: Todd Gibbon, longislandengineeringllc@outlook.com. Requests submitted after that time will not be considered Description The City will provide project benchmark, reference points, and staking to establish the alignment and elevation for the installation and construction of roads, sidewalks, pipes, and related infrastructurefeatures. These points shall constitute the field control by and in accordance with which the Contractor shall govern and execute the work.

Award

Water / Sewer

$275,578.00

Public - City

Paving, Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
8
Bidding Soon
99
All Active Projects
43
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2022

June 3, 2022

img_map_placeholder

Stuntz Ave, Ashland, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.