BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Concord, California. Completed plans call for the renovation of a educational facility.

Notice is hereby given that the governing board (Board) of the Mt. Diablo Unified School District (District or Owner) will receive sealed bids for the following project, (Project or Contract): BID# 1901 PAINTING SUMMER 2022 Results will be posted by the end of the day on the 7th . Any claim by a bidder of error in its bid must be made in compliance with section 5100 et seq. of the Public Contract Code. Any bid that is submitted after this time shall be non-responsive and returned to the bidder. The Project consists of: Power Wash, Prime, and Painting of the exterior buildings of three schools; Valley Verde Elementary, Pleasant Hill Middle School, Bel Air Elementary School. Contract documents must be supplied without delay in order to meet a mobilization date no later than June 2, 2022. All bids shall be on the form provided by the District. The Bidders license(s) must be active and in good standing at the time of the bid opening and must remain so throughout the term of the Contract. Failure to attend or tardiness may render bid ineligible. COVID-19 SITE WALK SAFETY PRECAUTIONS WILL BE ENFORCED The Districts Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. The District shall award the Contract, if it awards it at all, to the lowest responsive responsible bidder based on: The base bid amount and including Add/Alts. Last addenda to be issued not later than 72 hours prior to bid opening date and time, therefore all questions are due no later than 5 business days prior to the bid opening. The Project consists of: Power Wash, Prime, and Painting of the exterior buildings of three schools; Valley Verde Elementary, Pleasant Hill Middle School, Bel Air Elementary School.

Award

Educational

$620,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
48
Bidding Soon
1,884
All Active Projects
800
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.