BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Milton, Vermont. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project consists of the installation of approximately 570 feet of sidewalk beginning in the front of the Milton Fire/Rescue Building, along Bombardier Road to the intersection with Middle Road. The Town of Milton Highway Department will complete all subgrade work in preparation for the concrete work, including excavation and the installation of sub base. The contractor will be responsible for the installation of approximately 570 feet of concrete sidewalk, including ADA detectable warning strips on both sides of the Milton Fire/Rescue Building driveway, and at the Bombardier/Middle Road intersection. The sidewalk will intersect with an existing sidewalk path parallel to Middle Road. The concrete used shall be 3500 psi concrete, and a minimum of two concrete cylinder tests must be completed, and coordinated by the contractor. All work shall be compliant with the Town of Milton DPW Specifications. Details for sidewalks can be found in Drawing 12 of the DPW Specifications, which are available on the Town of Milton DPW website. All work shall be coordinated with the Highway Superintendent, Eric Gallas. Any non-hazardous removed material can be disposed of at the Towns storage site on Landfill Rd. Milton DPW will direct the contractor on where to dispose of any material, if necessary. The Town of Milton is requesting bids from qualified contractors for the construction of a sidewalk along Bombardier Road connecting the existing sidewalk near the Milton Fire/Rescue Building to the intersection with Middle Road. The current sidewalk on the south side of Bombardier Road terminates at the Milton Fire/Rescue Building. The proposed project will add approximately 570 feet of sidewalk, extending it to Middle Road. This sidewalk will connect residences to resources such as local businesses and the Town Municipal Offices, including the town library. This project will be managed by Kirsten Jensen, Town of Milton Public Works Engineer. Questions about the project should be submitted in writing, and directed to Kirsten Jensen at the kjensen@miltonvt.gov . All questions must be submitted by March 23, 2022 by 2:00 PM

Post-Bid

Sidewalks / Parking Lot

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
91
Bidding Soon
1,543
All Active Projects
617
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.