BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2023 at 7:00 PM

Updated January 29, 2024

Site work and paving for a mixed-use development in Milton, Vermont. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Route 7 Corridor Improvement Project from the Milton Diner to the Arrowhead Lake Dam designed to improve the identity, aesthetics and multimodal network in the Town Core. Sidewalk gaps will be filled in from West Milton Road to River Street Park on Route 7 South. Corridor enhancements which may include street lights, street trees, gateway centers, wayfinding signage and improved pedestrian crossings and public transit stops will be considered. Due to the area of the project, may require implementation phases. Conceptual design completed in July 2016. Repair and upgrade 810 linear feet of sidewalk on the eastern side of River Street between Main and Cherry Streets. Consideration should be given to widening to an 8'-10' shared-use pathway. This section of sidewalk has a significant number of curb cuts, which require 6" and 8" thick concrete sidewalk. $2.4M TIF Bond has voter approval, as of 12/21/16 $72k BAN has been issued The project is include in the City's 2024-2028 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$1,796,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
411
Active Projects
219
Bidding Soon
2,496
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

US-7, Milton, VT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.