BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2024 at 8:00 PM

Updated March 19, 2024

Site work for a water / sewer project in Milton, Vermont. Completed plans call for site work for a water / sewer project.

The Town of Milton is requesting proposals from qualified companies for upgrades to the Allen Drive Pump Station. The company's scope of work includes replacing the existing single phase submersible pumps with VFD's for single three phase conversion. No pre-bid meeting is scheduled. The Town of Milton existing pump station has 7.5 Hp Hydromatic pumps. The pump station services 34 units and sees flows of 8375 gpd on average. Onsite power is 120/240V 1 phase. The VFD's shall be installed on a panel board outside the existing panel. The VFD's should be rated for outside installation and in a NEMA rated enclosure. Pumps will be wired to Mission Controls. They must have a hydromantic breakaway fitting. Pump design point should be 120 GPM @ 57 ft TDH. All questions must be submitted by Thursday, February 15, 2024 by 9:00 AM. Questions about the project should be submitted in writing, and directed to Lisa Schaeffler at the lschaeffler@miltonvt.gov. All questions must be submitted by Thursday, February 15, 2024 by 9:00 AM No pre-bid meeting scheduled. The work for this project must be completed by June 30, 2024. The Town of Milton is requesting proposals from qualified companies for upgrades to the Allen Drive Pump Station. The company's scope of work includes replacing the existing single phase submersible pumps with VFD's for single three phase conversion. No pre-bid meeting is scheduled. The Town of Milton existing pump station has 7.5 Hp Hydromatic pumps. The pump station services 34 units and sees flows of 8375 gpd on average. Onsite power is 120/240V 1 phase. The VFD's shall be installed on a panel board outside the existing panel. The VFD's should be rated for outside installation and in a NEMA rated enclosure. Pumps will be wired to Mission Controls. They must have a hydromantic breakaway fitting. Pump design point should be 120 GPM @ 57 ft TDH Questions about the project should be submitted in writing, and directed to Lisa Schaeffler at the above email address. All questions must be submitted by Thursday, February 15, 2024 by 9:00 AM. A response to questions will be provided as an Addendum and will be posted to the Town's website. All firms must acknowledge the receipt of any addenda issued for this project

Award

Water / Sewer

$35,800.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
13
Bidding Soon
1,906
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

March 25, 2024

Project location map

Allen Dr, Milton, VT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.