BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to an educational facility in Summerland, British Columbia. Completed plans call for the renovation of a educational facility; for the addition of a 10,530-square-foot, one-story above grade educational facility; for the demolition of a educational facility; and for site work for a educational facility.

School District 67, Okanagan-Skaha is inviting general contractors to pre-qualify for the purpose of submitting bids for the construction of a new gymnasium addition and interior renovations at the Summerland Secondary School. Approximate Construction Budget: $7 million Summerland Secondary School was originally constructed in 1951. Subsequent additions have increased the capacity of the school to its current size of 700 students. To address several shortcomings with the physical education facilities, School District 67 has received funding approval from the Ministry of Education to add a second gymnasium including washrooms, change rooms, and storage space. The area of the addition is approximately 1,000m2, to be constructed directly abutting the north side of the existing gymnasium. In conjunction with the addition there will be a minor renovation to the existing gymnasium, as well as a minor amount of structure - and selective interior - demolition. Site works will include the construction of a new asphalt paved service lane around the new gymnasium as well as small amounts of sidewalks and concrete stairs. The primary structure for the new gym will be structural steel, on a concrete foundation. The gymnasium floor will consist of an athletic hardwood floor over a concrete slab on grade. Summerland Secondary School Gymnasium Addition - Contractor RFQ School District 67, Okanagan-Skaha. The existing school must be kept operational throughout the construction period except for the summer vacation period. The design consultants are currently completing the construction documents for the project. The anticipated milestone dates are: Tender Closing: February-March 2023 Construction Start: March-April 2023 Owner Move-in and Takeover July 15, 2024

Post-Bid

Educational

$7,000,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
6
Bidding Soon
138
All Active Projects
57
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2022

March 1, 2023

img_map_placeholder

9518 Main St, Summerland, BC


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.