BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 17, 2022 at 8:00 PM

Updated October 24, 2023

Site work for a water / sewer project in Palmer Lake, Colorado. Completed plans call for site work for a water / sewer project.

Project consisting of one schedule of work, generally consisting of: Base Bid 1) 18-inch diameter PS46, ASTM F679 PVC pipe: 8,078 lineal feet (LF) 2) New 5 I.D. manholes: 38 each (EA) 3) Remove existing manholes: 39 EA 4) 26 diameter steel casing pipe: 104 LF 5) Concrete casing pipe anchors: 4 EA 6) Trench cut-off walls: 7 EA 7) Bypass pumping 8) Asphalt street removal and replacement: 1,320 square yards (SY) 9) Seeding: 3.0 acres (AC) 10) Clearing and grubbing of trees 11) Sod replacement: 600 square feet (SF) 12) Preble s Meadow Jumping Mouse habitat mitigation: 1.4 AC 13) Together with all incidental materials of construction, complete in place

Bid Results

Water / Sewer

$3,548,098.00

Public - City

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
90
Bidding Soon
1,237
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2022

June 14, 2022

Project location map

Multiple Locations, Palmer Lake, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.