Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Ankeny, Iowa. Completed plans call for site work for a water / sewer project.
Landscaping (Tree and Shrub Clearing), Paving - Concrete, Construction, Tree Cutting, Concrete Pavement, Sawcutting/Sidewalk/Pavement, Erosion Control/Slope, Bank Stabilization, Traffic Control, Grade and Surface, Pavement Removal, Excavation, Stormwater Improvements, Landscaping - Seeding, Erosion Control - Temporary, Watershed Protection/Riprap, Sewer and Water Construction, Sitework/Excavating and Grading, Paving (Trail Paving), Grubbing & Clearing, Concrete Pavement Removal, Landscaping (Tree Trimming/Cutting). The Diamond Hills Greenway - Stream Repairs project includes multiple necessary repairs to the Diamond Hills Greenway located between SW Polk City Drive and SW 35th Street, in Ankeny, Iowa. The repairs include clearing, grubbing, and removal of nuisance vegetation, repairs to existing storm sewer infrastructure, grading, installation of erosion and sediment control devices, and extension of existing storm sewer outlets along the stream corridor. The construction improvements include approximately 270 linear feet of storm sewer ranging in size from 15-inch to 24-inch in diameter, four (4) storm sewer manholes, two (2) area intakes, and associated footings, aprons, and apron guards. The improvements will also include 260 square yards of 5" PCC trail replacement. Other associated improvements include temporary traffic control, surface restoration, and miscellaneous associated work necessary to complete the project. The Contractor shall fully complete Phase 1 of the project by August 19th, 2022. Phase 1 of the project shall include clearing, grubbing, and grading activities taking place along SW Applewood Street on the northern edge of the project boundary. Full completion for Phase 1 of the project shall be defined as all clearing, grubbing, and grading activities completed, with SW Applewood Street and sidewalks fully open to traffic. Should the Contractor fail to fully complete the work within this timeframe, liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s). The Contractor shall fully complete the overall project within forty (40) working days. Full completion for the overall project shall be defined as all utility, grading, and pavement construction completed, with the new sidewalks fully open to traffic, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work within this timeframe, liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s).
Award
Water / Sewer
$298,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
May 10, 2022
June 6, 2022
August 19, 2022
Multiple Locations, Ankeny, IA
Related To This Project
Ankeny, IA
Bid Date: Apr 12 2022
Ankeny, IA
Bid Date: Mar 15 2022
Ankeny, IA
Bid Date: Mar 29 2022
Ankeny, IA
Bid Date: Jul 27 2021
Ankeny, IA
Bid Date: Dec 09 2021
Ankeny, IA
Bid Date: Jun 11 2021
Ankeny, IA
Bid Date: Feb 16 2021
Ankeny, IA
Bid Date: Feb 09 2021
Ankeny, IA
Bid Date: May 17 2022
Ankeny, IA
--
Ankeny, IA
Bid Date: Mar 05 2019
Ankeny, IA
Bid Date: May 26 2020
Ankeny, IA
Bid Date: May 11 2021
Ankeny, IA
Bid Date: Jan 11 2022
Ankeny, IA
Bid Date: May 31 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--