BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Walden, Colorado. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Award Details Contract Award Date: Aug 31, 2022 Contract Award Number: 1240LT22C0065 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: M37ZH74Q33M8 Contractor Awarded Name: CUSTOM DESIGN FABRICATORS Contractor Awarded Address: Livermore, CO 80536-9542 USA Base and All Options Value (Total Contract Value): $807868.04 UPDATE - SITE VISIT is being rescheduled due to upcoming snow in the forecast. The new date for the site visit is Thursday, May 26, 2022 at 10:00 a.m. PRESOLICITATION and SITE VISIT This is a pre-solicitation notice. Proposals will be solicited by the USDA, Forest Service for the Michigan River Bridge Replacement project. The Medicine Bow-Routt National Forests and Thunder Basin National Grassland intends to issue a solicitation for the removal of a temporary ACROW bridge single reinforced single land truss bridge and install a single span steel beam superstructure with timber running planks and micropile foundation on National Forest System Road (NFSR) 792.1 -0.1 over South Fork Michigan River near Gould in Jackson County, Colorado (latitude 40.501970, longitude -106.022007). A site visit is being conducted prior to solicitation as the site is expected to be inaccessible prior to the actual solicitation and award of the project. This is not a solicitation and in no way commits the Government to award a contract. The Government does not intend to award a contract(s) based solely on this site visit nor does it intend to pay for any costs incurred in response to this announcement. The intent of this notice is to ensure that prospective vendors may see the site and proposed work prior to heavy snowfall and issuing the solicitation. This solicitation is anticipated to be issued in May of 2022. The solicitation and associated attachments will be posted in approximately 30 days. Drawings and specifications will be provided at time of solicitation issuance. A site visit is planned prior to issuance of the solicitation. Date: May 20, 2022 Time: 10:00 a.m. MT Location: Michigan River Bridge Project Location: The Michigan River Bridge located on National Forest System Road 792.1, south of Highway 14 near Gould, Colorado. In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $250,000 and $500,000. Contractors are required to be actively registered with the System for Award Management (SAM) https://www.sam.gov prior to submitting a proposal and to be considered for award. Registering in the SAM system is free. If you need assistance, please be sure to reach out your local Procurement Technical Assistance Center (PTAC) representative. PTAC is a free resource to all small business and your state representative's contact information can be found at the following website: https://www.aptac-us.org/. All future information about this acquisition, including amendments, will be distributed solely through this site. Interested parties are responsible for monitoring this site to ensure that they have the most up-to-date information about this acquisition. All responsible sources may submit a response to this announcement which will be considered by this agency. Place of Contract Performance: Gould ,Colorado in Jackson County Estimated Period of performance: July 5, 2022 to September 30, 2023 The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$807,868.00

Public - Federal

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
35
Bidding Soon
728
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2022

July 5, 2022

img_map_placeholder

To Be Determined, Walden, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.