BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 10, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a civil project in Santa Clara, California. Conceptual plans call for site work for a water / sewer project.

The Public Works Department of the City of Santa Clara proposes to rehabilitate the Bowers Avenue Underpass Storm Drain Pump Station (PROJECT). We are seeking a professional engineering firm to design and provide various professional services for the PROJECT in two phases: Phase 1 - City desires to conduct a detailed pump station assessment and prepare a Basis of Design Report (BOD). The BOD Report shall present condition assessment of the entire pump station including but not limited to all pumps, motors, wet well, electrical and mechanical controls and provide recommended improvements to address existing station deficiencies to meet Citys needs. The BOD Report will be used as the basis for funding requests for the next phase of the Project. Phase 2 - The proposed Agreement includes preparing bid documents (plans, specifications, and engineers estimate - PS&E) for public works bidding based on the approved BOD Report, assisting with building permit approval, and providing engineering support services during bid and award, construction, and post-construction phases. Q & A deadline: Jun 15, 2022 6:00:00 PM EDT Detail discussions about consultants scope of work for both phases and background information are in Attachment A, Scope of Services. Consultants who are selected to complete the first phase of the PROJECT will not forfeit the opportunity to submit proposals for the next phase of the PROJECT for detailed design, bidding and award support, and construction support. At the sole discretion of the City, the City may continue working with the selected consultant and amend the original design agreement to perform next phase of the PROJECT. If the City decides to continue working with the selected consultant for the next phase of the PROJECT, the selected consultant will be provided the opportunity to update their original cost proposal for the next phase of the PROJECT if additional scope of work has been identified beyond the services indicated in Attachment A, Scope of Services based on findings from the Phase 1 of the project. The method of contractor selection has not been determined at this time

Conceptual

Water / Sewer

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
380
Active Projects
153
Bidding Soon
2,466
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2023

Project location map

Bowers Ave, Santa Clara, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.