BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 1, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Pleasant Grove, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of August 1, 2022, project was awarded to Newman Construction Inc., awarded amount is $2,295,171.25** The Principal Items of Work Are Approximately as Follows: Construct Approximately 8970 Square Yards of Roadway With Curb and Gutter. Install Approximately 335 Feet of 8" Pvc C-900 Dr-18 Culinary Water Pipe and Associated Appurtenances. Install Approximately 960 Feet of 48" Class V Rcp, 20 Feet of 42" Class V Rcp, 70 Feet of 18" Class Iii Rcp, and 120 Feet of 15" Class Iii Rcp Storm Drain, 600 Feet of 15" Class V Rcp, 30 Feet of 18" Class V Rcp, 90 Feet of 36" Class V Rcp Storm Drain and Associated Appurtenances. Install 601 Feet of 24" Pvc Sewer Pipe, Install New Manholes, and Bypass Pumping. All BIDDERS are required to have payment and performance bonds underwritten by a Surety Company approved by the U.S. Department of the Treasury. (Circular 570, latest edition). Owner Reserves the Right to Accept or Reject Any or All Proposals, or Any Part of Any Proposal. Owner Reserves the Right to Waive Any Informality in Part or in Whole if It Is Deemed To Be in the Best Interest of Owner

Award

Roads / Highways

$2,295,171.00

Public - City

Paving, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Shoring and Underpinning
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Air Pollution Control, Air Pollution Control Equipment, Cyclonic Separators

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
49
Bidding Soon
904
All Active Projects
315
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2022

August 10, 2022

img_map_placeholder

S 1300 W St, Pleasant Grove, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.