Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Kings Bay Base, Georgia. Completed plans call for the renovation of a military facility.
FFP Design/Build Task Order for Hurricane Elsa Building Repairs at the trident Refit Facility. Work under this Task Order includes furnishing all labor, materials, and equipment necessary to provide extensive repair work to the three TRF buildings. The scope includes: B4026: Building 4026 is a 143,273 SF, one-story (39 foot tall) brick veneer/metal panel structure built in 1985 and requires restoration and renovation due to age and damage from a tornado associated with Hurricane Elsa. Restoration repairs include, but are not limited to, replacement of the brick veneer and metal panel exterior enclosure system, including cold formed steel substructure, portions of the membrane roofing system including insulation, replacement and refinishing of the interior construction and finishes, refurbishment of the overhead crane systems, replacement of the plumbing fixtures, replacement of the HVAC system, replacement of the fire protection and detection system, replacement of the electrical system, replacement of select specialty equipment and replacement of furnishings. B4027: Building 4027 is a 130,015 SF, one-story (32 and 45 foot tall) brick veneer/metal panel structure built in 1986 and requires restoration and renovation due to age and damage from a tornado associated with Hurricane Elsa. Restoration repairs include, but are not limited to, replacement of the brick veneer and metal panel exterior enclosure system, including cold formed steel substructure, portions of the membrane roofing system including insulation, replacement and refinishing of the interior construction and finishes, refurbishment of the hydraulic elevator, refurbishment of the overhead crane systems, replacement of the plumbing fixtures, replacement of the HVAC system, replacement of the fire protection and detection system, replacement of the electrical system, replacement of select specialty equipment and replacement of furnishings. B4028: Building 4028 is a 51,447 SF, one-story (29 foot tall) brick veneer/metal panel structure with a metal panel tower (82 foot tall) built in 1988 and requires restoration and renovation due to age and damage from a tornado associated with Hurricane ELSA. Restoration repairs include, but are not limited to, replacement of the brick veneer and metal panel exterior enclosure system, including cold formed steel substructure and exterior windows, replacement of the built up roof with a new membrane roofing system including insulation, replacement and refinishing of the interior construction and finishes, refurbishment of the overhead crane systems, replacement of the plumbing fixtures, replacement of the HVAC system, replacement of the fire protection and detection system, replacement of the electrical system, replacement of select specialty equipment and replacement of furnishings. Note from Sauer Construction: additional design documents will be available once developed. Addendum #1-#5 have been issued as of 7-15-2022.
Post-Bid
Military
$100,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 20, 2022
September 12, 2022
Multiple Locations, Kings Bay Base, GA
Related To This Project
Kings Bay Base, GA
Bid Date: May 17 2023
Kings Bay Base, GA
Bid Date: May 24 2023
Kings Bay Base, GA
Bid Date: Jun 09 2023
Kings Bay Base, GA
Bid Date: Aug 12 2022
Commerce, GA
Bid Date: Jul 19 2022
Saint Marys, GA
Bid Date: Jul 01 2022
Atlanta, GA
Bid Date: Jul 22 2022
Atlanta, GA
Bid Date: Mar 18 2022
Smyrna, GA
Bid Date: Jun 23 2022
Brunswick, GA
Bid Date: Dec 07 2021
East Point, GA
Bid Date: Jun 23 2022
East Point, GA
--
Savannah, GA
Bid Date: Mar 29 2022
Newnan, GA
Bid Date: Aug 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.