BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Springer, New Mexico. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Town of Springer, Colbert Ave. & 3rd St. Pavement Rehabilitation Notice is hereby given that competitive sealed bids will be accepted by Town of Springer for the Colbert Ave. & 3rd St. Pavement Rehabilitation. The work shall generally consist of: Mobilization/Demobilization, Existing Surface Brooming/Sediment Removal, Asphalt Patching, Pavement Fabric, Tack Coat, 1.5-Inch Thick Hot Mix Asphalt Pavement Overlay, Remove and Replace Concrete Valley Gutter and Curb and Gutter, and Valve and Manhole Collar Adjustments. Questions posted to the Engineer after 7/6/2022 may not be answered. Questions posted to the Engineer after 7/6/2022 may not be answered. Project Engineer: Karen Stearns, P.E. Engineering Analytics, Inc. (575) 445-7192 kstearns@enganalytics.com. There is no Pre-Bid Conference scheduled for this project. All interested parties are invited to attend the bid opening. Bid security in the amount of the amount bid must accompany each Bid in accordance with the Instructions to Bidders. s within One Hundred Twenty days after the date when the Contract Times commence to run.

Bid Results

Roads / Highways

$781,145.00

Public - City

Paving, Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2022

August 12, 2022

Project location map

3rd St & Colbert Ave, Springer, NM

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.