EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 12, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Winnipeg, Manitoba. Contact the soliciting agency for additional information.

Reference Number 0000226911 Source ID PU.MU.MB.559625.C103939 Bid Intent Not Available The Work to be done under the Contract shall consist of development of access to, and cleaning of, feeder main and force main crossings under creeks and rivers, and provision of inspection support services to specialized pipe inspection contractors. D3.2 The major components of the Work are as follows: (a) External Pipeline Inspection Support at Force Main Bridge Sites (Sites 1 - 3). (i) Remove cladding and insulation from portions of force main. (ii) Assist/facilitate exterior inspection by specialized inspection contractor and engineering staff. (iii) Complete repairs as required and reinstall insulation and cladding. (b) Complete Low Pressure Leakage Tests on Fort Garry - St. Vital Interceptor Siphons (Site 4). (c) Internal and External Inspection Support at West Perimeter Force Main (Site 5). (i) Development of site access. (ii) Establishment and operation of flow bypass piping. (iii) Civil modifications to facilitate inspection through: Installation of corrosion test lead assemblies. Installation of new manhole, gate valve, launch wye assembly, and tapping sleeve on south alignment. Installation of new manhole and launch wye assembly on north alignment. Cleaning of pipeline crossing under river using cleaning pigs, jet flushers, and other equipment as required. Assist interior and exterior inspections by specialized inspection contractor(s). Final pipeline modifications. Site restoration. (d) Internal (In-Line) Pipeline Acoustic Inspection Support at Feeder Main Sites (Sites 6 - 11): (i) Development of Site Access. (ii) Coring of chamber roof slabs to facilitate inspection tool access. (iii) Removal of existing 750 mm diameter manhole at West End Feeder Main at Truro Creek (Site 9). (iv) Construct new air release manholes and tapping sleeves at West End Feeder Main Sites (Sites 8 and 9). (v) Provision of other miscellaneous inspection support. (vi) Site restoration. D3.3 Inspection of the following pipelines are to be undertaken as a part of this Contract: (a) Site 1: Old Forts Bridge Force Mains (external inspection) (b) Site 2: Provencher Bridge Force Mains (external inspection) (c) Site 3: Norwood Bridge Force Main (external inspection) (d) Site 4: Fort Garry - St. Vital Interceptor Siphons (leakage testing) (e) Site 5: West Perimeter Force Main (cleaning, internal, and external inspection) (f) Site 6: Dakota Feeder Main (internal inspection) (g) Site 7: Rouge Road Feeder Main (internal inspection) (h) Site 8: West End Feeder Main at Omand's Creek (internal inspection) (i) Site 9: West End Feeder Main at Truro Creek (internal inspection) (j) Site 10: Haney - Moray Feeder Main (internal inspection) (k) Site 11: Murray Avenue Feeder Main (internal inspection) D3.4 Third party inspections by specialized pipeline inspection contractors will be grouped into multiple inspection periods. Inspection mobilization dates are subject to change based on weather, high water conditions, availability of the pipeline inspection contractors, and system operations within the City of Winnipeg. (a) Inspection 1 as tendered under Tender 508-2021 Provision of Electromagnetic Inspection Services (i) Site 1: Old Forts Bridge Force Mains - External electromagnetic pipeline inspection (ii) Site 2: Provencher Bridge Force Mains - External electromagnetic pipeline inspection (iii) Site 3: Norwood Bridge Force Main - External electromagnetic pipeline inspection (b) Inspection 2 as tendered under Tender 508-2021 Provision of Electromagnetic Inspection Services (i) Site 5: West Perimeter Force Main - Electromagnetic in-line pipeline inspection (c) Inspection 3 as tendered under Tender 509-2021 Provision of Pipeline Acoustic Leak Detection and CCTV Services (i) Site 6: Dakota Feeder Main - Internal acoustic/CCTV inspection (ii) Site 7: Rouge Road Feeder Main - Internal acoustic/CCTV inspection (iii) Site 8: West End Feeder Main at Omand's Creek - Internal acoustic/CCTV inspection (iv) Site 9: West End Feeder Main at Truro Creek - Internal acoustic/CCTV inspection (v) Site 10: Haney - Moray Feeder Main - Internal acoustic/CCTV inspection (vi) Site 11: Murray Avenue Feeder Main - Internal acoustic/CCTV inspection (d) Third party inspections are not required for Site 4: Fort Garry - St. Vital Interceptor Siphons. (c) Site 1 - Old Forts Bridge Force Mains, South Abutment (d) Site 2 - Provencher Bridge Force Mains, East Abutment (e) Site 2 - Provencher Bridge Force Mains, West Abutment (f) Site 6 - Dakota Feeder Main (g) Site 4 - Fort Garry - St. Vital Force Main Siphon, Inlet Chamber (h) Site 4 - Fort Garry - St Vital Force Main Siphon, Outlet Chamber (i) Site 5 - West Perimeter Force Main, Pumping Station (j) Site 11 - Murray Ave Feeder Main (k) Site 8 - West End Feeder Main - Omand's Creek (l) Site 9 - West End Feeder Main - Truro Creek (m) Site 7 - Rouge Road Feeder Main (n) Site 10 - Haney-Moray Feeder Main B3.2 Proponents attending the Site Investigation are required to register for the Site Investigation at least 48 hours prior to the Site Investigation by contacting the Contract Administrator listed in D5.1. Details of meeting locations and estimated times at sites will be provided to registered participants. B3.3 The Bidder is advised that all valve chambers are Confined Space Entry locations. Confined Entry will not be permitted during Site Investigations. B3.4 Although attendance at the Site Investigation is not mandatory, the City strongly suggests that Bidders attend. B3.5 The Bidder shall not be entitled to rely on any information or interpretation received at the Site Investigation unless that information or interpretation is the Bidder's direct observation, or is provided by the Contract Administrator in writing. B3.6 The Bidder may view portions of the site located within public right-of-ways without making an appointment. The method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Scheduling of Work, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Siding
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, High-Performance Coatings
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding, Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Backfill, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
39
Bidding Soon
322
All Active Projects
131
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2023

img_map_placeholder

Multiple Locations, Winnipeg, MB


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

RFP - Pipeline Access Modifications, Cleaning and Support for River Crossing Inspections

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.