Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 29, 2022 at 8:00 PM
Updated November 14, 2023
Renovation of a mixed-use development in Mediapolis, Iowa. Completed plans call for the renovation of a water / sewer project and power facility.
BASE BID: Bid includes installation of a 1,144 kW (DC) PV solar array and balance of system components. The array will be installed on 4.5 acre area of cleared land. Balance of system components include racking, combiner boxes, inverters, wiring, overground and underground cable raceways, electrical enclosures, and mounting hardware. A 6-foot galvanized chain link fence with access gate will be erected around the array perimeter. There will be a medium voltage (2400 VAC) connection to utility and existing pump station building, including installation of utility poles and all medium voltage equipment required for functional connection. ADDITIVE ALTERNATE #1: Includes removal and stockpiling of topsoil throughout fenced area of array, placement of light duty woven geotechnical fabric, and placement of 6 inches of aggregate base inside of fenced area.
Bid Results
Solar Power Generation
$1,929,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2022
August 22, 2022
To Be Determined, Mediapolis, IA
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
