Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a military facility in McConnell AFB, Kansas. Completed plans call for the renovation of a military facility.
Contract Award Date: Aug 26, 2022 Contract Award Number: W50S7X-22-C-0002 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: JUQ9BXSQ61J8 Contractor Awarded Name: SOUTHTOWN GLASS INC Contractor Awarded Address: Liberty, MO 64068-1397 USA Base and All Options Value (Total Contract Value): $222935.00 Work shall consist of but is not limited to the following: Task 1: Replace and reroute a portion of the existing copper refrigerant line sets on two existing 30 Ton Liebert Computer Room Air Conditioning (CRAC) Units. Each Liebert Unit has two R-22 refrigerant circuits each having approximately 120 pounds of refrigerant. Due to operational requirements of the server farm, only one circuit of one Liebert Unit can be down at a time. R-22 Freon can be recycled for #1 and #3 CRAC units if the acid content is acceptable, otherwise new Freon shall be used. CRAC-2 will be completely replaced with a new unit. Completely replace the refrigerant lines for the new CRAC-2 and charge the system. Each of the 6 existing line sets is comprised of one 1 inch line and one 1 1/4 inch line (see drawings for new and existing routing). Replacement lines will use ACR copper piping and will be insulated with Rubatex insulation. Provide insulation blocks at pipe supports and aluminum jacket around exterior piping to protect insulation. There will be combination isolation/shraeder valves installed at the condenser end of the new portion of the line sets as well as isolation/shraeder valves installed on the linesets just outside the indoor unit (Evaporator) approximately 4 feet above the finished floor. The result will be two isolation/shraeder valves on each line. Include installation of replaceable filter dryer assemblies. Linesets will exit the building through the concrete precast wall at approximately 12 feet high. Lines will be supported by pipe stands or hangers keeping at least a 12 foot clearance above the ground until they reach the condensing units. Note: The contractor will ensure cooling to the server farm is maintainted during the performance of this work by only having one circuit of each CRAC unit down at a time. Air conditioning must be sufficient to keep the server farm continuously at 73 degrees +/- 2 degrees. Task 2: Replace CRAC-2 in its intirety. The new unit will consist of an interior 30 Ton Precision Cooling System CRAC Unit with a new 30 Ton DX Air-Cooled Microchannel Condensing Unit. The new units will be installed in the same locations as the old interior/exterior systems. Due to the criticality of the server farm, it is critical the demolition of the existing CRAC only occur immediately prior to the installation of the new unit. Install combination isolation/shraeder valves at the condenser end of the line sets as well as just outside the indoor unit (Evaporator) approximately 4 feet above the finished floor. Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to Mr. Darin L Brun and SMSgt Brent Geschwentner at the following addresses: Darin.brun@us.af.mil & brent.geschwentner@us.af.mil Firm Name and Telephone Number Visitor's Name Drivers License Citizenship Project magnitude is betw een $100,000.00 and $250,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Military
$222,935.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2022
September 5, 2022
To Be Determined, McConnell AFB, KS
Related To This Project
McConnell AFB, KS
Bid Date: Sep 01 2022
McConnell AFB, KS
Bid Date: Feb 28 2023
McConnell AFB, KS
Bid Date: May 30 2023
McConnell AFB, KS
Bid Date: May 26 2023
McConnell AFB, KS
--
McConnell AFB, KS
Bid Date: Jul 24 2023
McConnell AFB, KS
Bid Date: Aug 23 2023
McConnell AFB, KS
Bid Date: Aug 25 2023
McConnell AFB, KS
Bid Date: Aug 03 2022
McConnell AFB, KS
Bid Date: Jul 13 2022
McConnell AFB, KS
Bid Date: Jul 08 2022
McConnell AFB, KS
Bid Date: Jun 07 2022
McConnell AFB, KS
Bid Date: Jun 08 2022
McConnell AFB, KS
Bid Date: May 24 2022
McConnell AFB, KS
Bid Date: Apr 11 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.