BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 22, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a water / sewer project in Aurora, Colorado. Completed plans call for site work for a water / sewer project.

**As of September 22, 2022, project was awarded to CARDINAL COATINGS, LLC, awarded amount is $163,857.50.** First Creek Interceptor (FCI) Segment 0 previously installed several manholes, many of which were lined. A portion of the Segment 0 manholes were not lined as they were identified to be raised by a future developer to a new finished grade. The manholes are slated to be raised by the developer in August 2022. This Project includes lining the raised manholes and completing manhole rehabilitation at two additional locations, one near E 30th Ave and the I-225 overpass, and the second at Baranmor Parkway and I-225 overpass. The two additional manhole locations were discovered during a separate Capital Improvements Project and it was determined their need for rehabilitation could be delayed until this project. Question Acceptance Deadline 07/27/2022 04:00 PM EDT Questions are submitted online No This Project generally includes lining nine (9) manholes located near 26 th Ave and E470 with a Sauereisen 210xHB product and completing manhole rehabilitation at two (2) additional locations. The first near E 30th Ave and the I-225 overpass, and the second at Baranmor Parkway and I-225 overpass. First Creek Interceptor (FCI) Segment 0 previously installed several manholes, many of which were lined. A portion of the Segment 0 manholes were not lined as they were identified to be raised by a future developer to a new finished grade. The manholes are slated to be raised by the developer in August 2022. This Project includes lining the raised manholes and completing manhole rehabilitation at two additional locations, one near E 30th Ave and the I-225 overpass, and the second at Baranmor Parkway and I-225 overpass. The two additional manhole locations were discovered during a separate Capital Improvements Project and it was determined their need for rehabilitation could be delayed until this project. Any questions must be submitted in writing by email to Catherine Schumacher, Project Manager, at cschumac@auroragov.org, and to Nathan Jones, Contract Administrator at njones@auroragov.org. Emailed questions shall contain the project name and number in the email subject line, and must be received no later than 2:00 p.m., local time, July 27, 2022. Questions will be answered via addendum posted to The Rocky Mountain E-Purchasing System aka BidNet

Award

Water / Sewer

$163,858.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Allowances, Cash Allowances, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Gaskets
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties, Other Specialties, Pest Control Devices
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Bases, Ballasts, and Paving, Irrigation, Planting Irrigation, Drip Irrigation, Planting, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Fuel Distribution Utilities, Natural-Gas Distribution, Natural-Gas Piping, Hydronic and Steam Energy Utilities, Steam Energy Distribution, Underground Steam and Condensate Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
126
Bidding Soon
1,550
All Active Projects
690
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2022

September 5, 2022

img_map_placeholder

Multiple Locations, Aurora, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.