Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 22, 2022 at 8:00 PM
Updated September 15, 2023
Site work for a water / sewer project in Aurora, Colorado. Completed plans call for site work for a water / sewer project.
**As of September 22, 2022, project was awarded to CARDINAL COATINGS, LLC, awarded amount is $163,857.50.** First Creek Interceptor (FCI) Segment 0 previously installed several manholes, many of which were lined. A portion of the Segment 0 manholes were not lined as they were identified to be raised by a future developer to a new finished grade. The manholes are slated to be raised by the developer in August 2022. This Project includes lining the raised manholes and completing manhole rehabilitation at two additional locations, one near E 30th Ave and the I-225 overpass, and the second at Baranmor Parkway and I-225 overpass. The two additional manhole locations were discovered during a separate Capital Improvements Project and it was determined their need for rehabilitation could be delayed until this project. Question Acceptance Deadline 07/27/2022 04:00 PM EDT Questions are submitted online No This Project generally includes lining nine (9) manholes located near 26 th Ave and E470 with a Sauereisen 210xHB product and completing manhole rehabilitation at two (2) additional locations. The first near E 30th Ave and the I-225 overpass, and the second at Baranmor Parkway and I-225 overpass. First Creek Interceptor (FCI) Segment 0 previously installed several manholes, many of which were lined. A portion of the Segment 0 manholes were not lined as they were identified to be raised by a future developer to a new finished grade. The manholes are slated to be raised by the developer in August 2022. This Project includes lining the raised manholes and completing manhole rehabilitation at two additional locations, one near E 30th Ave and the I-225 overpass, and the second at Baranmor Parkway and I-225 overpass. The two additional manhole locations were discovered during a separate Capital Improvements Project and it was determined their need for rehabilitation could be delayed until this project. Any questions must be submitted in writing by email to Catherine Schumacher, Project Manager, at cschumac@auroragov.org, and to Nathan Jones, Contract Administrator at njones@auroragov.org. Emailed questions shall contain the project name and number in the email subject line, and must be received no later than 2:00 p.m., local time, July 27, 2022. Questions will be answered via addendum posted to The Rocky Mountain E-Purchasing System aka BidNet
Award
Water / Sewer
$163,858.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 07 - Thermal and Moisture Protection
Division 09 - Finishes
Division 10 - Specialties
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 4, 2022
September 5, 2022
Multiple Locations, Aurora, CO
Related To This Project
Aurora, CO
Bid Date: Jul 26 2022
Aurora, CO
--
Aurora, CO
--
Aurora, CO
Bid Date: Sep 14 2022
Aurora, CO
Bid Date: Mar 29 2023
Aurora, CO
Bid Date: Sep 06 2022
Aurora, CO
Bid Date: Sep 13 2022
Aurora, CO
Bid Date: Aug 23 2022
Aurora, CO
--
Aurora, CO
Bid Date: Aug 13 2018
Aurora, CO
--
Aurora, CO
Bid Date: Feb 15 2022
Aurora, CO
Bid Date: May 17 2019
Aurora, CO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.