BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Aurora, Colorado. Completed plans call for site work for a water / sewer project.

**As of September 22, 2022, project was awarded to CARDINAL COATINGS, LLC, awarded amount is $163,857.50.** First Creek Interceptor (FCI) Segment 0 previously installed several manholes, many of which were lined. A portion of the Segment 0 manholes were not lined as they were identified to be raised by a future developer to a new finished grade. The manholes are slated to be raised by the developer in August 2022. This Project includes lining the raised manholes and completing manhole rehabilitation at two additional locations, one near E 30th Ave and the I-225 overpass, and the second at Baranmor Parkway and I-225 overpass. The two additional manhole locations were discovered during a separate Capital Improvements Project and it was determined their need for rehabilitation could be delayed until this project. Question Acceptance Deadline 07/27/2022 04:00 PM EDT Questions are submitted online No This Project generally includes lining nine (9) manholes located near 26 th Ave and E470 with a Sauereisen 210xHB product and completing manhole rehabilitation at two (2) additional locations. The first near E 30th Ave and the I-225 overpass, and the second at Baranmor Parkway and I-225 overpass. First Creek Interceptor (FCI) Segment 0 previously installed several manholes, many of which were lined. A portion of the Segment 0 manholes were not lined as they were identified to be raised by a future developer to a new finished grade. The manholes are slated to be raised by the developer in August 2022. This Project includes lining the raised manholes and completing manhole rehabilitation at two additional locations, one near E 30th Ave and the I-225 overpass, and the second at Baranmor Parkway and I-225 overpass. The two additional manhole locations were discovered during a separate Capital Improvements Project and it was determined their need for rehabilitation could be delayed until this project. Any questions must be submitted in writing by email to Catherine Schumacher, Project Manager, at cschumac@auroragov.org, and to Nathan Jones, Contract Administrator at njones@auroragov.org. Emailed questions shall contain the project name and number in the email subject line, and must be received no later than 2:00 p.m., local time, July 27, 2022. Questions will be answered via addendum posted to The Rocky Mountain E-Purchasing System aka BidNet

Award

Water / Sewer

$163,858.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
39
Bidding Soon
982
All Active Projects
411
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2022

September 5, 2022

img_map_placeholder

Multiple Locations, Aurora, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.