Site work and new construction of a mixed-use development in Santa Paula, California. Completed plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; and water / sewer project.

**As of September 13, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Grading, Installation of Utilities. Prep for Placement of New Prefabricated Public Three (3) Stall Restroom. The purpose of this scope of work is to obtain bids for the new restroom facility at Teague Park located on the southwest corner of the park. Below are the line items that need cost estimates: 1. Grading Remove all organic materials from excavation area (800 sq ft.) Excavate and remove soil 3' in depth and 5' beyond building perimeters (800 sq ft.) Bottom of excavation needs to be compacted to 90% (800 sq ft.) Install soil in lifts of 8" and compact to a minimum of 90% All lifts must be tested every 2' by soils engineer All on-site soil must be used. Any import must be approved by soils engineer Final grade will be brought up to match existing grade taking in account of proper drainage away from structure (800 sq ft.) Sand will need to be added to bid and left on-site for final grading completed by others (5 cubic yards) 2. Foundation Install new concrete area in front of new structure to match existing and connect to existing walkways per city of Santa Paula's standards (350 sq ft.) 3. Utilities Disconnect utilities from existing restroom facility and rerouted to the new restroom facility. All utilities will need to be routed to within 5' of the new facility approx. 80' to the east. Water (80 LF.) Sewer 4" SDR 35 (80 LF.) Electrical (80 LF.) All utilities will need to be connected to new restroom facility once structure is completed. All water connections will need to be flushed prior to connection completion. The new structure will have stub outs for water and sewer. Electrical connections are terminated at new panel located on the exterior wall of new structure with new 100 amp service and wire pulled. Provide meter if required. All utilities on exterior of restroom are the contractor's responsibility. Interior connections are completed by others.

Award

Playgrounds / Parks / Athletic Fields

$49,000.00

Public - City

New Construction, Site Work

4

3

2

6

Subscribe For Documents

207 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
330
Active Projects
164
Bidding Soon
2,878
All Active Projects
1,286
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 25, 2022

September 26, 2022

December 31, 2022

img_map_placeholder

300 S Steckel Dr, Santa Paula, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.