Published September 15, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Cape May, New Jersey. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of September 15, 2022, project was awarded to Fred M. Schiavone Construction, Inc, awarded amount is $2,007,700.50. ** Proposals must be made on the standard Proposal Forms in the manner designated in the Bid Documents, must be enclosed in sealed envelopes bearing the name and address of the Bidder, and the name of the work on the outside addressed to Clerk, City of Cape May; and must be accompanied by a statement of Consent of Surety from a surety company authorized to do business in the State of New Jersey and acceptable to the City and either a Bid Bond, Certified or Cashier's Check drawn to the order of the City of Cape May for not less than ten percent (10%) of the amount bid, except that the check need not exceed $20,000.00. The successful bidder is hereby notified that a performance bond for the full amount of the project is required. The successful bidder will be required to execute a contract for the performance of the said work or the furnishing of said material or both, as the case may be, and a surety bond to be executed by a reliable surety company in a sum equal to the amount of the contract price for said work and/or material, guaranteeing the performance of the contract, which surety bond and contract shall be approved as to form and execution by the City Solicitor. The bidders shall also be required to comply with the following: A. Affirmative Action requirements (N.J.S.A. 10:5-31 et. seq.and N.J.A.C. 17:27). B. Certification Pursuant to P.L. 2012, C.25 (no investment activities in Iranian financial or energy sectors) C. The provisions of the New Jersey Prevailing Wage Act (N.J.S.A. 34:11-56.25 et. seq). D. Americans with Disability Act of 1990, Title II (42 U.S.C. S121 01). E. Worker and Community Right-to-Know Act (N.J.S.A. 34:5A-1). F. Stockholder Disclosure Certification (P.L. 1977, C.33, N.J.S.A. 52:25-24.2). G. Business Registration Certification (N.J.S.A. 52:32-44). H. Public Works Contractors Registration (N.J.S.A. 34:11-56.48). I. Consent of Surety (N.J.S.A. 40A:11-22). J. Addendum Acknowledgement (N.J.S.A. 40A:11-23c. 1), 2) &3)). K. Subcontractors List (N.J.S.A. 40A:11- 16). The award of the contract for this project will not be made until the necessary funds have been provided by the City of Cape May in a lawful manner. The City of Cape May reserves the right to consider the bids for sixty (60) days after the receipt of said bids. The City of Cape May also reserves the right to reject any or all bids or to waive any informalities in the best interest of the City of Cape May. Each proposal and bid must be submitted in accordance with the terms of the aforesaid specifications, must be made on standard proposal forms contained in the bid documents and shall be delivered to the place and hour mentioned above. The proposed work for the project shall include, but not be limited to, installation of sanitary sewers and lateral services, water mains and lateral services, reconstruction and restoration of existing pavements, curbs, sidewalks, gutters and driveways, all as shown on the plans and specified in the Bid Documents. 210 Calendar Days

Award

Roads / Highways

$2,007,701.00

Public - City

Paving, Site Work

16

14

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Temporary Construction, Temporary Bridges, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Wood Doors, Plastic Doors, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Concrete Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Water Utilities, Water Utility Distribution Piping, Public Water Utility Distribution Piping, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Public Sanitary Utility Sewerage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
77
Bidding Soon
972
All Active Projects
482
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2022

October 1, 2022

img_map_placeholder

Pennsylvania Ave, Cape May, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Reconstruction of Pennsylvania Avenue - Phase 7

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.