Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 29, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a mixed-use development in Fairlee, Vermont. Working plans call for site work for a playground / park / athletic field.

As of 8/29/2022 the project has been put on hold for the time being. This will be re-issued. Floating slab to be poured and prefabricated bus shelter to be assembled and installed on slab. Project Location: Fairlee Railroad Station Park and Ride, 320 US Route 5 North For the full RFQ please contact Chris Brimmer, ZPED Adm. 802-333-4363x103

Final Planning

Playgrounds / Parks / Athletic Fields

$15,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
62
Bidding Soon
1,255
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 28, 2022

Project location map

Multiple Locations, Fairlee, VT

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed