EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 8, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Springfield, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The work generally consists of furnishing all equipment, labor and materials for, but not necessarily limited to the following: removal/replacement of existing storm inlets and stormwater cross pipe, bituminous leveling course and bituminous overlay. A certified check or bank draft payable to the order of Marion Heights Borough, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to ten percent (10%) of the total of the Bid, shall be submitted with each bid Bid submissions should be labeled Bid Marian Heights Borough, Clemont Street Reconstruction The Bidder shall include the fully completed Non-Collusion Affidavit with the bid. In addition to the Equal Employment requirements of Executive Order 11246 regarding discrimination, the CONTRACTOR must establish a 6.9% goal for female participation and a 1% goal for minority participation in his/her aggregate on-site construction workforce for contracts in excess of $10,000. The Marion Heights Borough is utilizing federal funds for this project, and Northumberland County has adopted a Minority and Women Business Enterprise (MBE/WBE) plan in accordance with Executive Orders 11625, 12138, and 12432 and a Section 3 Action Plan in accordance with Title 24 Part 75 Code of Federal Regulations. As such, the bidders/offerors must submit documentary evidence of minority and women business enterprises and Section 3 business concerns who have been contacted and to whom commitments have been made. Documentation of such solicitations and commitments shall be submitted with the bid. Moreover, the CONTRACTOR shall strive to meet the MBE goal of 5% and the WBE goal of 3% for contracts of $25,000 or more. For projects which the amount of HUD or CDBG funding exceeds $200,000 the CONTRACTOR must attempt to meet the minimum numerical goals of which 25% or more of the total number of labor hours worked by all workers on a Section 3 project are Section 3 workers, per 24 CFR Part 75.19; and 5% or more of the total number of labor hours worked by all workers on a Section 3 project are Targeted Section 3 workers, as defined in 24 CFR Part 75.21. Northumberland County, in accordance with its Section 3 Action Plan, may provide a bid preference to a bidder who is a Section 3 business concern. MBE/WBE and Section 3 business concerns shall be afforded full opportunity to bid without discrimination. Davis-Bacon and Related Acts apply to this Project. Bids may be held by Marion Heights Borough for up to 60 days from the date of opening for the purpose of reviewing the bids and investigating the qualifications of bidders prior to awarding the contract. The Marion Heights Borough reserves the right to reject any or all bids, to waive any irregularities, or to negotiate contract amounts.

Award

Roads / Highways

$128,825.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Electricity, Temporary Water, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
418
Active Projects
234
Bidding Soon
3,706
All Active Projects
1,771
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2023

April 6, 2023

img_map_placeholder

Claremont Rd, Springfield, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Clermont Street Reconstruction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.