BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a civil project in Fenton, Missouri. Completed plans call for site work for a water / sewer project.

The project Pump Station will be located in; Pere Cliff Mobile Home Park in High Ridge, MO; with a Force Main along Antire Road to the District's Existing Pump Station located behind Dottie's Apartments in High Ridge, MO. 63049. Questions should be directed to Mr. Bob Hembrock, Executive Director, at Northeast Public Sewer District's Office. Jefferson County, Mo. 636-343-5090 Ext. 226 This project consists of 3021 lineal feet of 2" Restrained Joint PVC Force Main including 970 lineal feet of Directional Bore including (11) connection service tees. (4) Air Vacuum Release Manhole Assemblies. 440 lineal feet of 8" Gravity Sewer Construction, 3 manholes, (11) 8"x4" Wyes and service lateral. (1) 48" Pump Station Assembly with a Valve Vault and Storage Basin Structure. A block barrier Wall with a concrete surface, (92') Wrought Iron Fence including Electrical Panel Support and Roof Structure, 50'of 6" Steel Casing Bore. The Project also includes Asphalt surfacing on Pere Cliff Drive along with additional Asphalt Driveway repair and site restoration. All work for this project is confined within Roadway and Utility easement. The second portion of the Project will consist of the Abandonment and closure of the Existing Pere Cliff Plant. This includes the removal of approximately 120 CY of sand (disposed at an approved landfill or facility) demolition of (3) concrete tanks (2) - 7.33' x 10.5' x 7' deep tanks and (1) 15'x13'x8' deep. (1) sand filter concrete structure (35' x 40). (1) 5' Sq. concrete structure. Removal of 6' privacy fence. Adding approximately 170 CY of dirt to the site with surface restoration and grass. All work shall be constructed in a workmanlike manor for a complete and operational system. All work for these projects are confined within Existing or Procured easements, within the Pere Cliff Mobile Home Park, Dotties Apartments, and along Antire County Road.

Award

Water / Sewer

$648,368.00

Public - City

Site Work

13

15

2

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
54
Bidding Soon
791
All Active Projects
306
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2022

February 8, 2023

img_map_placeholder

Multiple Locations, Fenton, MO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.