BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 8, 2022 at 7:00 PM

Updated January 25, 2024

Site work for a civil project in Fenton, Missouri. Completed plans call for site work for a water / sewer project.

The project Pump Station will be located in; Pere Cliff Mobile Home Park in High Ridge, MO; with a Force Main along Antire Road to the District's Existing Pump Station located behind Dottie's Apartments in High Ridge, MO. 63049. Questions should be directed to Mr. Bob Hembrock, Executive Director, at Northeast Public Sewer District's Office. Jefferson County, Mo. 636-343-5090 Ext. 226 This project consists of 3021 lineal feet of 2" Restrained Joint PVC Force Main including 970 lineal feet of Directional Bore including (11) connection service tees. (4) Air Vacuum Release Manhole Assemblies. 440 lineal feet of 8" Gravity Sewer Construction, 3 manholes, (11) 8"x4" Wyes and service lateral. (1) 48" Pump Station Assembly with a Valve Vault and Storage Basin Structure. A block barrier Wall with a concrete surface, (92') Wrought Iron Fence including Electrical Panel Support and Roof Structure, 50'of 6" Steel Casing Bore. The Project also includes Asphalt surfacing on Pere Cliff Drive along with additional Asphalt Driveway repair and site restoration. All work for this project is confined within Roadway and Utility easement. The second portion of the Project will consist of the Abandonment and closure of the Existing Pere Cliff Plant. This includes the removal of approximately 120 CY of sand (disposed at an approved landfill or facility) demolition of (3) concrete tanks (2) - 7.33' x 10.5' x 7' deep tanks and (1) 15'x13'x8' deep. (1) sand filter concrete structure (35' x 40). (1) 5' Sq. concrete structure. Removal of 6' privacy fence. Adding approximately 170 CY of dirt to the site with surface restoration and grass. All work shall be constructed in a workmanlike manor for a complete and operational system. All work for these projects are confined within Existing or Procured easements, within the Pere Cliff Mobile Home Park, Dotties Apartments, and along Antire County Road.

Award

Water / Sewer

$648,368.00

Public - City

Site Work

13

15

2

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
96
Bidding Soon
1,246
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2022

February 8, 2023

Project location map

Multiple Locations, Fenton, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.