Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Fenton, Missouri. Completed plans call for site work for a water / sewer project.
The project Pump Station will be located in; Pere Cliff Mobile Home Park in High Ridge, MO; with a Force Main along Antire Road to the District's Existing Pump Station located behind Dottie's Apartments in High Ridge, MO. 63049. Questions should be directed to Mr. Bob Hembrock, Executive Director, at Northeast Public Sewer District's Office. Jefferson County, Mo. 636-343-5090 Ext. 226 This project consists of 3021 lineal feet of 2" Restrained Joint PVC Force Main including 970 lineal feet of Directional Bore including (11) connection service tees. (4) Air Vacuum Release Manhole Assemblies. 440 lineal feet of 8" Gravity Sewer Construction, 3 manholes, (11) 8"x4" Wyes and service lateral. (1) 48" Pump Station Assembly with a Valve Vault and Storage Basin Structure. A block barrier Wall with a concrete surface, (92') Wrought Iron Fence including Electrical Panel Support and Roof Structure, 50'of 6" Steel Casing Bore. The Project also includes Asphalt surfacing on Pere Cliff Drive along with additional Asphalt Driveway repair and site restoration. All work for this project is confined within Roadway and Utility easement. The second portion of the Project will consist of the Abandonment and closure of the Existing Pere Cliff Plant. This includes the removal of approximately 120 CY of sand (disposed at an approved landfill or facility) demolition of (3) concrete tanks (2) - 7.33' x 10.5' x 7' deep tanks and (1) 15'x13'x8' deep. (1) sand filter concrete structure (35' x 40). (1) 5' Sq. concrete structure. Removal of 6' privacy fence. Adding approximately 170 CY of dirt to the site with surface restoration and grass. All work shall be constructed in a workmanlike manor for a complete and operational system. All work for these projects are confined within Existing or Procured easements, within the Pere Cliff Mobile Home Park, Dotties Apartments, and along Antire County Road.
Award
Water / Sewer
$648,368.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 15, 2022
February 8, 2023
Multiple Locations, Fenton, MO
Related To This Project
Fenton, MO
Bid Date: Apr 15 2022
Fenton, MO
--
Fenton, MO
Bid Date: Jun 28 2022
Fenton, MO
Bid Date: Feb 15 2023
Fenton, MO
Bid Date: Feb 01 2023
Fenton, MO
Bid Date: Feb 01 2023
Fenton, MO
Bid Date: Apr 05 2023
Fenton, MO
Bid Date: Apr 18 2023
Fenton, MO
Bid Date: Nov 02 2022
Fenton, MO
Bid Date: Nov 15 2022
Fenton, MO
Bid Date: Oct 06 2022
Fenton, MO
Bid Date: Oct 25 2022
Fenton, MO
Bid Date: Nov 03 2022
Saint Charles, MO
Bid Date: Dec 07 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.