BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a warehouse / distribution facility in Ellenburg Center, New York. Completed plans call for the construction of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.

The Town Highway Department will be completing portions of the site work and excavation, as outlined in the Contract Documents. This project is funded in whole or part by a CWIA/EPF Water Quality Improvement Project Grant administered by the New York State Department of Conservation. The Town of Ellenburg encourages participation of qualified MWBE prime contractors, subcontractors, and suppliers on this project. MWBE goals applicable to all contracts as outlined in the Instructions to Bidders are 20%. Any bid may be withdrawn without prejudice prior to the official bid submission time or any publicized postponement thereof. Bid security shall be furnished in accordance with the Instructions to Bidders. Attention of bidders is particularly called to the requirements as to condition of employment to be observed and to the minimum wage rates to be paid under the Contract. Refer to Instructions to Bidders & Bid Form for requirements regarding modifications and withdrawing of bids. The Owner reserves the right to reject any or all bids and to waive any informalities or defects in such bid either before or after opening. The construction of a wood-framed sand and salt storage building founded on cast-in-place concrete foundations; to include a new electrical power service from the existing Highway Garage to the new building, and lights, outlets, and other electrical appurtenances. BIDDER hereby proposes to perform all WORK for the construction of Contract No. 2 - Electrical; mobilization, stakeout of utilities, fine excavation for duct banks, protection of existing facilities and structures, construction of electrical services, backfilling and compaction, installation of panelboards, conduit, conductors, lighting, controls, and receptacles, periodic and final cleanup, coordination with Owner and other prime contractors regarding other work being performed at the site, and all work necessary to complete the Salt Storage Building electrical system in strict accordance with the CONTRACT DOCUMENTS, within the time set forth therein, and at the prices stated below. PN - 21-013

Bid Results

Warehouse / Distribution

$42,500.00

Public - City

New Construction, Site Work

17

16

7

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
102
Bidding Soon
1,569
All Active Projects
614
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2022

October 14, 2022

img_map_placeholder

Bradley Pond Rd, Ellenburg Center, NY


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.