BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Center Line, Michigan. Completed plans call for the renovation of a educational facility.

Center Line Public Schools, 2017 Bond Issue, Bid Package #7B, consisting of: Project 21-154 Center Line HS HVAC & Flooring Renovations 26300 Arsenal Street Center Line, MI 48015 Project 21-154 Wolfe Middle School HVAC & Flooring Renovations 8640 McKinley Center Line, MI 48015 This Bid Package will consist of a sealed bid for the following Bid Division: 108: Carpentry / General Trades 109: Roofing / Sheetmetal 115: Metal Studs / Drywall / Acoustical Treatments 120: Painting 142: HVAC 143: Electrical All bids must include the Familial Disclosure Affidavit (Section 004205), the Iran Linked Business Affidavit (Section 004210), and the Criminal Background Check Affidavit (Section 004220). Bid Result : BD 108: Carpentry & General - BJ Construction Services, Inc - $ 65,800 BD 109: Roofing - Schena Roofing & Sheet Metal - $ 44,895 BD 115: Metal Studs/Drywall/Plaster/EIFS - ANM Construction Co. Inc. - $ 76,340 BD 120: Painting - Papa's Painting - $ 20,000 BD 142: Heating, Ventilating & Air Conditioning - Gee & Missler, Inc. - $ 2,254,328 BD 143: Electrical - Max Electric - $ 173,475 All Bids must be accompanied by a Bid Security, in either the form of a bid bond or certified bank check, in the amount of five (5) percent of the amount of the Bid, payable to Center Line Public Schools, as a guarantee that if the Bid is accepted, the School District is secured from loss or damage by reason of the withdrawal of the Bid or failure of the Bidder to enter a Contract for performance, Further, the Bidder will execute the Contract, provide the required insurance certificate(s) and file the required bonds within ten (10) days after notice of award of Contract but prior to Work commencing. If awarded a contract, the successful bidder may be required to furnish a Performance Bond and Labor and Material Payment Bond in the amount of 100% of the contract price. Center Line Public School District reserves the right to reject any or all bids received, to waive any informalities and irregularities in the bidding, and to accept a bid other than the lowest bid.

Bid Results

Educational

$2,634,838.00

Public - City

Renovation

97

23

20

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
80
Bidding Soon
1,482
All Active Projects
587
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2022

June 14, 2023

img_map_placeholder

Multiple Locations, Center Line, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.